|
US$10,000.00-400,000.00
|
1 Set
(MOQ)
|
Basic Info.
Plastic Type
Thermoplastic, Tube Head Injection
Plasticizing Way
Screw Type
Clamping Way
Hydraulic & Mechanical
Computerized
Computerized
Certification
CE, ISO9001:2008
Distance Between Tie Bars(Width)(mm)
730 mm
Screw Speed (Rpm)
0 - 350 Rpm
Injection Rate (G/S)
1415 G/S
Ejector Stroke(mm)
100 mm
Plastic Processed
PP, PC, ABS, PPR, HDPE, Mlldpe, PA, Polystyrene
Applicable Industries
Manufacturing Plant
Showroom Location
Egypt, Turkey, Italy, Saudi Arabia, Pakistan
Shot Volume (Theoretical)
700/822 Cm3
Distance Between Tie Bars(Height)(mm)
680 mm
Production Capacity
500 Set/Sets Per Year
Product Description
HJ/450BA High Speed Injection Molding/Moulding Production Line
Product Description
Specification
Machine model
| HJ/450BA
|
Screw type
| A
| B
|
Screw diameter (mm)
| 60
| 65
|
Screw L/D ratio (L/D)
| 27
| 24.9
|
Shot volume (theoretical) (CM3)
| 700
| 822
|
Injection weight (PS)(g)
| 637
| 748
|
Pump max.pressure (Mpa)
| 153/130
|
Pump motor power (servo)(KW)
| 40+40+40
|
Number of heating area(Segment)
| 3+1
|
Machine dimension (L*W*H) (M)
| 8.2*1.95*2.45
|
1. What kind of plastic material can be used on this machine?
PP, PE, PS, ABS and other general material could be used on this machine.
If you have other special material such as PC, PMMA, PVC, please contact us for further information. 2. What is guarantee time for this machine?
12 months after installation or 18 months again B/L date.
3. What kind of shipping container for this machine?
Containere choose will depends on the different machine size . 20HQ,40HQ,40GP will suitable for different size machine.
4. How much is Engineer service charge?
We can send experienced technician to customer's country for guiding the installation and commission the machine, also train the
customer's employee. Customer need to afford technician visa charge, round trip air ticket expense, accommodation and
transportation in local. Also customer needs to pay USD 80 per days to technician as salary.
5. How long will be for installation and commission this machine?
If customer prepare all necessary thing such as power supply, water supply, hydraulic oil, plastic material, plastic mold,
installation and commission period will be within 7days including training customer's employee.
6. How many workers are needed to operate this machine?
One worker only.
7. What is the power consumption for this machine?
Power consumption is determined by the product. Different product requests different power consumption.
>>
62m Chinese Jordan New Diesel Truck Mounted Concrete Pump Price
>>
19 Inch Metal Base Fullscream Led 4K Tv Curve
>>
Aluminium Laser Cut Gates Perforated Garden Gates Decorative Aluminum Fence corten sheet Metal Garden Fencing Trellis Gates
>>
Sales of Automatic High-Quality Side Plate Cleaning Machine
>>
Intelligent Sensor LED Light Pedal/Open Garbage Bin/Dustbin
>>
28 pcs Water Tank Leak Detector Car Universal Radiator Pressure Tester /Cooling System Pressure Test Kit
>>
Diamond Grinding Wheels 5 Inch Diamond Cup Wheel Polishing and Cleaning Stone/ Concrete
>>
MED Approved 15ppm 1.5m3/h Marine Oily Water Separator
>>
Top New Auto Parts Grille for FJ75 VDJ79
>>
Custom logo high elastic durable knee pads
>>
OEM Roof Top Tent Custom Foldable Car Rooftop Tent Suppliers Soft Cover Lightweight Rooftop Tent
>>
Tractor Mounted Potato Harvester for Sale (4U-70)
>>
1600mm Working Width Self-Propelled Garlic Harvester on Sale
>>
58cn H Artificial Real Touch Fake Orchid with Ceramic Vase
>>
Auto dimming rearview mirror 0078 exterior rear mirror for bus 6122 6127 6137 bus spare part
>>
bamboo steamer25.4cm
>>
Thrust Roller Bearing Separable Inner Diameter 320mm, Spherical Roller Thrust Bearing
>>
Baby Activity Gym Educational Toys Mat with Piano Rack Pedal Baby Play Mat
>>
SRL-300/600kg High Speed Plastic PVC Mixer Machine
>>
Agricultural Middle-Duty Disc Harrow (Medium Mounted Disc Harrow)