Basic Info.
Type
Tube Shoulder Injection
Plastic Type
Thermoplastic
Plasticizing Way
Plunger Type
Computerized
Computerized
Speed
85~120 Pieces Per Minute
Tube Diameter(mm)
16~60 mm
Extrusion Spraying Mode
Servo Motor Control
Change Time of Head Tooling
18~23 Minutes
Change Time for The Orifice Pin
20~25 Minutes
Change Time of PE Color
30~35 Minutes
Specification
3470*2900*2490mm
Production Capacity
100set/Year
Packaging & Delivery
Package Size
347.00cm * 290.00cm * 249.00cm
Package Gross Weight
4500.000kg
Product Description
Extruded Tube Line (project solution)
| line #1: extruder (1/2/5/6 layer) - sorter - header (60/70/120) - sorter - printer (3/5/6/8 color)- sorter - capper(50/100) |
| | line #2: extruder (1/2/5/6 layer) - sorter - printer (3/5/6/8 color)- sorter - header (60/70/120)- sorter - capper(50/100) |
Laminated Tube Line (project solution)
| line #1: Laminates Welder (auto unwebbing) - sorter - header (120)- sorter - capper(100) |
| | line #2: Laminates Welder (manual unwebbing) - sorter - header (70)- sorter - capper(50) |
Q1:Why is the Fast PBL upgrade necessary?
New laminate developments require the Fast PBL upgrade to maintain quality. Running PBL like ABL causes issues, compromising tube quality and increasing rejection rates and costs.
Q2:Are you manufacturer?
Yes, We are the manufacturer and trading company.
Q3: What information should the customer provide to get an accurate quotation from us?
The customer should provide the related technical requirements, drawings, pictures, industrial voltage, planned output, etc
Q4: What is the payment term?
The payment term is 30% down payment, and 70% before shipment(T/T mode), we also accept other payment term, like L/C, DA, D/P etc
Q5. How long is your machine's warranty period?
All our machine have one year guarantee, starting from finished installation.
Q6. How could we do after one year warranty period?
We also can do service for you, but you need pay salary for my technician 80USD/day.
Q7. How could we do if the parts broken within warranty?
We would express the free replacement parts during the warranty date.
Q8. How do we solve the machine problem after your engineer leaving?
Generally speaking, there will be no problem after finish installing. In case you have any problem. You can contact our after sales specialist at any time.weour after-sales department with 30 engineers.Our engineers will take a solution video according your description.
>>
Industrial Feed Blender Powder Mixing Machine Stainless Steel Drum Mixer
>>
Amniotic Fluid Aspirator Calf Breathing Assist Convenient Farm Home Livestock Machinery
>>
CE CNC DIY Fiber Laser Marking Logo Printing Engraving Machine for Metal and Plastic Material Surface
>>
52cc Hand Push Gasoline Tiller
>>
Factory Hard Chrome Plated S45c Gcr15 Material Induction Linear Motion Shaft
>>
Christmas led light with battery /event wedding rechargeable PE plastic led tree star snow led Christmas decorative lights
>>
American style white interior commercial office hotel room bedroom solid wooden door designs internal modern panels wood doors
>>
Agricultural Machinery Combined Rice Corn Sorghum Harvesting Crops Harvester High Quality
>>
Labor Protection Gloves Knitting Machine 7g/10g/13G
>>
Automatic High Speed Bowl Feeding Pillow Nougat Bar Flow Packing Machine
>>
Commercial Stainless Steel Juice Dispenser for Hotels Food Beverage
>>
Higher Quality Low Price Pulse Laser Cleaning Machine for Wood Metal Stone
>>
High Speed Cosmetic Tube Heading Machine Shoulder Machine
>>
beautiful Rice cooker, soup, steamed egg wechat:13510231336
>>
offset ps plate
>>
Disposable Inkjet Capsule Filters with PP Media 5 Micron / 10 Micron
>>
Leyo T1000 Xyz Travel 1000/520/420 mm 3/4/5 Axis Compact Machining Center
>>
XCMG Manufacture Slm3500 3.5m3 Self Loading Mobile Concrete Mixer
>>
Wholesale Factory Hot Electroplating Soft TPU Mobile Phone Case for M-Horse Pop8/Smart8 M-Horse S22
>>
Dew Point Meter HT-1292D for sale