|
US$50.00-200.00
|
1 Roll
(MOQ)
|
Basic Info.
Installation
Wall Mounted
Water Blocking Plate
With Water Blocking Plate
Mirror Lamp
With Mirror Lamp
Application
Home, Hotel, Office
Certification
CE, ISO9001, RoHS, CCC
Accessories
Drawer Basket, Drawer Slide, Handle & Knob, Hinge
After-Sale Service
Free Spare Parts / Return and Replacement
Transport Package
Flat Packing /Assembled Packing
Production Capacity
60, 000 Sets/Year
Product Description
| Door Materials&Finish | Solid wood,MDF,Particle board,Lacquer,Melamine,HPL(Laminate),UV,PET,Veneer |
| Carcass material | Particle board, HMR board, Plywood |
| Coutertop | Quartz, Granite, Acrylic, Calacata style quartz, Corian, Caesarstone, Silestone, HPL laminate |
| Hardware brand | Blum/Reggar/Hettich/Hafele/DTC |
| Lift up system, Corner system , Pantry system, Trashbin, Cutlery tray, Dish rack, Spice rack, etc. |
| Packing | Assembled packing/ Flat packing/ Palletizing |
| Delivery time | 35-50 days after receipt of deposit |
| Trade term | EXW/FCA/FOB/CIF |
| Loading Port | Guangzhou |
Q1. What is the Trade Term?
A1: Ex-works, FOB Guangzhou, FOB Shenzhen, CIF.
Q2. How many colors are available for selection?
A2: Colors can be customized according to customer requirements.
Q3. What is the production lead time?
A3: Typically 35-50 days after receiving the order during the normal season.
Q4. What are the payment terms?
A4: Payment can be made via T/T or L/C at sight .
A 50% deposit is required to start production, and the remaining balance is due before shipment once the goods are ready.
Q5. What are the packing details?
A5: The products are packed in knock-down carton boxes with pearl cotton inside for protection. Glass parts are additionally secured with wooden frames to ensure safety during transit.
Q6. What documents will be provided?
A6: We will provide the Bill of Lading, Commercial Invoice , Packing List, and Certificate of Origin. These documents will enable you or your broker to complete customs clearance on your end.
Q7. What happens if products are damaged during shipping?
A7: Our shipping agency takes full responsibility for ensuring the safety of the goods during transit. In the rare event of damage, they will be liable for compensation. For minor issues, we will assist you and provide replacements for the damaged parts.
Q8. How long does it take to replace missing parts in a shipment?
A8: If there are any small missing components, we will dispatch them via DHL as soon as possible, typically within one week.
>>
Wholesale Hoodie Made To Order From 2022 Best Supplier.
>>
Customized Logo Tinplate Tin Kpop Cartoon Anime Button Pin Custom 3D Enamel Masonic Military Army Scout Pilot Wing Chaplain Security Guard Officer Metal Badge
>>
100% No Glue 3D Elastic Dome Cap Wear&Go Glueless Wig with HD Lace Frontal Closure 5X5 4X4 13X4 Swiss Film Lace
>>
24V Battery Charger Fully Electric Pallet Stacker Forklifts Material Handling Equipment 1.5ton
>>
China wood pellets plus A1 CN001 SURE BSL SBP Pine wood sawdust pellets
>>
Sheet Metal Bending Machine Hpb Series CNC Press Brake with Da66t 5+1 Axes
>>
Personal Care Three Layer disposable medical mask 3 ply disposable masks earloop mask disposable in stock
>>
Reasonable Price Alex Drawer Gloss White Unit
>>
Ball Lapping Machine for Ball Valve Grinding Process Conventional Type up to 20inch
>>
Excellent Quality Rubber Mixer Kneader for Rubber and Plastic
>>
Hot Selling Customized Wire Mesh Stainless Steel Window Screen for Insect Proof
>>
crown metal cap 26mm aluminum ring pull lid Maxi cap glass bottle closure
>>
automatic Roll paper sheeting machine
>>
Used Original Hitachi Zx70-5A Mini Crawler Track Digger Secondhand 7 Ton Excavator
>>
Whoesale Customized Recyclable Coated Paper Papercard Printing Paper Packaging Box
>>
Rotating Travel Head Automatic Die Cutting Machine for Foam, Rubber, Artificial Leather and Fabric
>>
24V/12V 61V01-00020 2-0011 automatic bus door system electric bus door actuator door opener systems for bus
>>
Marya Pharmaceutical Automatic 6/8/10 Nozzles Freeze-Dried Powder Auger Vial Powder Filling Machine for Bottle Filling Production Line Supplier
>>
1-21/32" Truck Valve Stem Tubeles Brass Truck Tire Valve Stems TR501
>>
Ss Rod Sus 201 304 310 316 321 Stainless Steel Round Bar with Bright Surface