Basic Info.
Type
Tube Shoulder Injection
Plastic Type
Thermoplastic
Plasticizing Way
Plunger Type
Computerized
Computerized
Speed
85~120 Pieces Per Minute
Tube Diameter(mm)
16~60 mm
Extrusion Spraying Mode
Servo Motor Control
Change Time of Head Tooling
18~23 Minutes
Change Time for The Orifice Pin
20~25 Minutes
Change Time of PE Color
30~35 Minutes
Specification
3470*2900*2490mm
Production Capacity
100set/Year
Packaging & Delivery
Package Size
347.00cm * 290.00cm * 249.00cm
Package Gross Weight
4500.000kg
Product Description
Extruded Tube Line (project solution)
| line #1: extruder (1/2/5/6 layer) - sorter - header (60/70/120) - sorter - printer (3/5/6/8 color)- sorter - capper(50/100) |
| | line #2: extruder (1/2/5/6 layer) - sorter - printer (3/5/6/8 color)- sorter - header (60/70/120)- sorter - capper(50/100) |
Laminated Tube Line (project solution)
| line #1: Laminates Welder (auto unwebbing) - sorter - header (120)- sorter - capper(100) |
| | line #2: Laminates Welder (manual unwebbing) - sorter - header (70)- sorter - capper(50) |
Q1:Why is the Fast PBL upgrade necessary?
New laminate developments require the Fast PBL upgrade to maintain quality. Running PBL like ABL causes issues, compromising tube quality and increasing rejection rates and costs.
Q2:Are you manufacturer?
Yes, We are the manufacturer and trading company.
Q3: What information should the customer provide to get an accurate quotation from us?
The customer should provide the related technical requirements, drawings, pictures, industrial voltage, planned output, etc
Q4: What is the payment term?
The payment term is 30% down payment, and 70% before shipment(T/T mode), we also accept other payment term, like L/C, DA, D/P etc
Q5. How long is your machine's warranty period?
All our machine have one year guarantee, starting from finished installation.
Q6. How could we do after one year warranty period?
We also can do service for you, but you need pay salary for my technician 80USD/day.
Q7. How could we do if the parts broken within warranty?
We would express the free replacement parts during the warranty date.
Q8. How do we solve the machine problem after your engineer leaving?
Generally speaking, there will be no problem after finish installing. In case you have any problem. You can contact our after sales specialist at any time.weour after-sales department with 30 engineers.Our engineers will take a solution video according your description.
>>
SS316 Socket Head Bolt ISO7380 Hex Socket Head Machine Screw/SS304 Button Head Socket Cap Screw
>>
Tree planting digging machines / ground hole drill / earth auger portable ground drill
>>
Toyo-Intl Ocs-B Type 0.5 Ton-50 Ton Digital Crane Scale
>>
REX521GHHPSH07G ABB module supply
>>
Diameter 10mm Diamond Wires Saw for Marble/Limestone
>>
Warehouse Flared Welded Galvanized Steel Metal Storage Wire Mesh Decking for Pallet Racking
>>
Hot Sales All Purpose Customized Colors Spray High Application Good Coverage OEM Acrylic Spray Paint
>>
Farm Mechinery Mini Diesel Motocultor Power Tiller Two Wheel Mini Walking Hand Tractor Foragriculture
>>
Multifunctional Kitchen 800 Waste Shredder/Organic Waste Shredder/Food Waste Shredding Machinec/Crusher Machine
>>
plastic dish and bowl storage rack basket dishes & plates drying rack Kitchen Organizer Storage Rack
>>
Cooray Cr-5mc Tg1200 5-Axis Machining Center
>>
Wooden Sawdust Pallet Mdf Board Mould Hot Press Machine to Recycle Waste Wood
>>
Geming Explosion-Proof Lifting Columns in a Hospital Bed Hot Sale Hta2
>>
Ey28d/Gx390/186fa Engine Walk Behind Flat Saw Concrete Floor Saw Construction Saw
>>
Best Selling Dog Food Processing Machine Big Capacity Dry Dog Food Making Machine
>>
High Performance of Impact Crusher
>>
Wholesale 2025 Butterfly Christian Religion Blessed Jesus Logo Charm Keychains in Bulk
>>
Electronic Universal Tensile Testing Machine adhesive tape Peeling /Plastic Impace tensile test Equipment
>>
CAMC brand engine accessories engine exhaust rocker arm assembly
>>
PVC Plastic Powder Hot and Cold Mixer Unit Raw Material Mixing Machine