Basic Info.
Type
Tube Shoulder Injection
Plastic Type
Thermoplastic
Plasticizing Way
Plunger Type
Computerized
Computerized
Speed
45~60 Pieces Per Minute
Tube Diameter(mm)
13~55 mm
Extrusion Spraying Mode
Servo Motor Control
Change Time of Head Tooling
20 Minutes
Change Time for The Orifice Pin
5~10 Minutes
Change Time of PE Color
25~30 Minutes
Specification
2400*1400*2300mm
Production Capacity
100set/Year
Packaging & Delivery
Package Size
240.00cm * 140.00cm * 230.00cm
Package Gross Weight
2500.000kg
Product Description
Extruded Tube Line (project solution)
| line #1: extruder (1/2/5/6 layer) - sorter - header (60/70/120) - sorter - printer (3/5/6/8 color)- sorter - capper(50/100) |
| | line #2: extruder (1/2/5/6 layer) - sorter - printer (3/5/6/8 color)- sorter - header (60/70/120)- sorter - capper(50/100) |
Laminated Tube Line (project solution)
| line #1: Laminates Welder (auto unwebbing) - sorter - header (120)- sorter - capper(100) |
| | line #2: Laminates Welder (manual unwebbing) - sorter - header (70)- sorter - capper(50) |
Q1:Why is the Fast PBL upgrade necessary?
New laminate developments require the Fast PBL upgrade to maintain quality. Running PBL like ABL causes issues, compromising tube quality and increasing rejection rates and costs.
Q2:Are you manufacturer?
Yes, We are the manufacturer and trading company.
Q3: What information should the customer provide to get an accurate quotation from us?
The customer should provide the related technical requirements, drawings, pictures, industrial voltage, planned output, etc
Q4: What is the payment term?
The payment term is 30% down payment, and 70% before shipment(T/T mode), we also accept other payment term, like L/C, DA, D/P etc
Q5. How long is your machine's warranty period?
All our machine have one year guarantee, starting from finished installation.
Q6. How could we do after one year warranty period?
We also can do service for you, but you need pay salary for my technician 80USD/day.
Q7. How could we do if the parts broken within warranty?
We would express the free replacement parts during the warranty date.
Q8. How do we solve the machine problem after your engineer leaving?
Generally speaking, there will be no problem after finish installing. In case you have any problem. You can contact our after sales specialist at any time.weour after-sales department with 30 engineers.Our engineers will take a solution video according your description.
>>
Canned Yellow Peach Halves in Light/Heavy Syrup
>>
Newest Type Shoe Machine / Heel Nailing Machine
>>
Brass Sprinkler Model No. Zst with NBR Spring Seal for Durability
>>
Hot sale wheat cutter and binder machine chill reaper machine
>>
Vape Metal Detector Electronic Toys Electric Cigarette PCB Bluetooth Circuit Board
>>
handheld cement concrete helicopter walk behind power trowel machine petrol ce road
>>
commercial use manufacture coal powder variety shape briquette coal making forming machine production line
>>
Uice Drinking water dispenser mineral water bottles container with faucet Water Carrier
>>
2kw 3kw Tuber Product Tube Laser Cutting Machine Channel Steel Pipe Metal Tube High Precision Machine Fiber Laser Cutting Machine Plate Tube
>>
Other performance parts High performance bus parts electric system 3623-00184 ZK6122HD9 odometer sensor use for chinese bus
>>
200 micron stainless steel heat resistance mesh filter disc
>>
43 Meter New Concrete Pumping Machine Sym5290thb 430c in Kazakhstan
>>
Non-Slip, No-Mark Wooden Hangers for Hotels
>>
Cq6230A Hot Sale China High Precision Mini Hobby Lathe
>>
Multifunctional Screen Brush and Dust Brush Cleaner Foldable Detachable Window Mesh Screen Cleaner Brush with Wet and Dry Dual
>>
ESK-1860B Commercial Glass Door Dry Age Fridge
>>
Cleanroom Panel High Efficiency Fiberglass HEPA Filter Air Filter Manufacturer
>>
Aluminium Alloy 5050 Wire 3.97mm for Rivet/5056 5083 5086 5154 5182 High Quality Aluminum Wire Copper Wire Brass Wire 5356 Aluminum Wire
>>
Basket Mill for Ink/Paint/Dye/Sc/Pesticide Production
>>
Modular Seamless Switching Videowall Processor 8x8