US$3,000.00-30,000.00
|
1 Set
(MOQ)
|
Basic Info.
Voltage
208/220/380/415/440/480V etc.
Certification
ISO, CE, SGS
Using Life
Longer Than 15 Years
Roller Working Length
1200mm
Transport Package
Standard Export Packing or as Your Requested
Specification
SGS, ISO9001: 2008, CE
Production Capacity
50sets/Month
Product Description
Rubber Mixing Machine Open Mixing Machine XK-450
| Item | XK-160 | XK-250 | XK-360 | XK-400 | XK-450 | XK-550 | XK-560 | XK-660 | XK-710 |
Roll diameter | mm | 160 | 250 | 360 | 400 | 450 | 550 | 560-510 | 660 | 710 |
Roll working length | | 320 | 620 | 900 | 1000 | 1200 | 1500 | 1530 | 2130 | 2200 |
Front roll linear speed | r/min | 9 | 16.3 | 16.7 | 19.3 | 21.8 | 22.5 | 27.2 | 28 | 31.9 |
Speed ratio of rolls | | 01: 01.4 | 01: 01.1 | 01: 01.3 | 01: 01.3 | 01: 01.3 | 01: 01.2 | 01: 01.2 | 01: 01.2 | 01: 01.5 |
Max roll space | mm | 4.5 | 8 | 10 | 10 | 12 | 16 | 15 | 0.5-15 | 0.5-15 |
Compound feeding capacity | kg | 1-2 | 10-15 | 20-25 | 18-35 | 50 | 50-65 | 50-65 | 165 | 190 |
Motor power | kW | 5.5 | 18.5 | 30 | 45 | 55 | 110 | 90 | 240 | 280 |
Dimensions(L× W× H) | | | | | | | | | | |
L | mm | 1133 | 2722 | 4200 | 4920 | 5405 | 6646 | 6270 | 7280 | 8185 |
W | mm | 920 | 1115 | 1780 | 1780 | 1740 | 2736 | 2282 | 3400 | 3910 |
H | mm | 1394 | 1345 | 1760 | 1800 | 1790 | 2105 | 2000 | 2530 | 2270 |
Gross weight | T | ~2 | ~3.2 | ~6.5 | ~8 | ~11.4 | ~22 | ~22.5 | ~49 | ~51 |
Salient Features:
1. Superior Mixing Performance.
2. Low Operating Cost with High Productivity.
3. Compact Construction, maximum Floor Utilization.
4. Latest Technology Update, Meets Current World Standards.
5. Maintenance Free.
6. Reliable and Experienced Service Back Up.
7. Easy to Install & Ready to Run.
8. No continuous Lubrication hence heavy saving on lubrication cost, wear & tear and maintenance.
9. Auto reversing electric Panel.
10. Simple & easy maintenance.
Test Before Delivery:
In order to save time and cost for customers, we produced rubber mixing mill at the factory wires between the motor and the control cabinet already connected, the customer's only need to connect the wires to the outside the control cabinet. After Rubber Mixing Mill complete installation will have the load test 4-6 hours to reduce debugging time and cost.
FAQ
1. Delivery time of the rubber machines?
This is specially designed machine according to your specific requirement.
From engineer designing to production completion, it needs about 25 to 35 days.
2. What does your factory do regarding quality control?
We pay much more importance to quality control from the very beginning to the end of production.
Every machine will be fully assembled and carefully tested before shipment.
3. What's the machine quality guarantee?
Quality guarantee time is one year.We choose world famous brand components to keep our machine in perfect working condition.
4. Are you able to give installation and commissioning overseas? How long time will it take?
Yes, we can supply overseas service and technical support but customer needs to pay for the cost of the installation.
Small machine usually takes within 2~3 days.
Big plant usually takes about 30 days.
5. How can I trust you to deliver the right machine as I ordered?
We will absolutely deliver a good quality machine as we discussed and confirmed in the order.
The core of our company culture is innovation, quality, integrity and efficiency. Also we have had much good cooperation with world famous rubber production manufacturers. If you come to our factory, we can show you're the user around us.
6. How can we go to your side?
We are located in Qingdao City, Shandong province, China. The name of airport is Qingdao Liuting airport.
We will pick up you at the airport.
Packaging
Equipment painting completed before delivery, and then wrapped with stretch film, avoid rubbing the paint off the surface, wooden packaging can be customized, key parts, such as electronic control box, will be wrapped by shockproof packaging materials, and then packed in wooden cases.
There are 15 experienced engineers and 108 skilled workers in our company, guaranteeing delivery on time as stipulated in the contract. At the same time, the company established a long-term cooperative relation with cosco, for ensuring the goods arriving port on time.
In addition, our machineries have exported to America, Mexico, India, Vietnam, South Africa, Singapore, Malaysia, Indonisia, Australia, Sri Lanka and many other countries.
Our other products:
Welcome to Visit our Factory!
>>
Modern Luxury Stone Bathroom Towel Cabinet Vanity Cabinet Set with Countertop LED Smart Mirror Cabinet
>>
Air-Cushion / Open / Hydraulic Type Headbox for Paper Production Making Machine
>>
China Good Price High-Quality X5036 Vertical Milling Machine for Sale
>>
Stainless Steel Flange Cover /Blind Plate DN1000 304L Pn2.5/6/10/16
>>
Bulk High Quality White Customized Plain Custom Printed Kids T-Shirt
>>
Professional Manufacture Solar Photovoltaic Stent for Pv Panel System
>>
0.80mm Nylon Coated Wire Pet Coated Wire for Binding
>>
Shinite CNC Press Brake 40 63 100 125 160 250 300 Ton CNC Plate Bending Machine
>>
Brass Flush Valve 1 Inch Brass Ball Valve With Handle Iron
>>
40L 8bar Air Tanks with ASME Um Stamp and Nb Registration
>>
Freestanding Ellipse Skirt Acrylic Bathtub with E0 Environmental Protection Level for Five Star Hotel
>>
Smooth Surface Biocompatible Zirconia Tooth Crown Easy Maintain
>>
400KW 500KVA RICARDO Diesel Generator
>>
ISO4179 BS EN545 EN598 cement coating thickness black restricted joint tyton push-on socket cast ductile iron pipes
>>
Single Post Car Lift for Washing Car
>>
Motorcycle Stainless Steel Exhaust Pipe/Header/ Manifold/Refit Motorcycle Parts/Modification Muffler
>>
Germany Zerodur Zero Expansion Glass Ceramic/Germany Zerodur Glass/Zerodur Optical
>>
Durable Lightweight Flyknit Shoes for Fashionable and All-Day Comfort
>>
Car Exterior Accessories for Ford Bronco 2022 Zinc Alloy Car Sticker Decal DIY Body Kit Change Side Letter Color
>>
Fashion Men black Lamb Leather Jacket/men leather jackets/Pakistan leather jackets Plus Size