Basic Info.
Model NO.
Tube End Forming Machine
Diameter Range
200-1500mm
Production Capacity
10000 Piece/Pieces Per Month
Packaging & Delivery
Package Size
100.00cm * 100.00cm * 100.00cm
Package Gross Weight
10000.000kg
Product Description
Product Description
Evaporator Making Machine
Detailed Information
| | Parameter | Data |
1
| Wire Material
| Carbon steel wire
|
2
| Wire Diameter
| 1.1-1.5mm
|
3
| Cutting Length
| 100-5000mm
|
4
| Work Speed
| 0~150m/min, adjustable by Inverter
|
5
| Cutting Tolerance
| +/-0.5mm/1m
|
6
| Control System
| PLC control / HMI
|
7
| Motor Power
| 1.50KW
|
8
| Electric System
| 380V, 50Hz, 3Phae (Customized)
|
9
| Dimension
| 1700 x 750 x 1350 mm (main machine)
|
10
| Weight
| 860 KG
|
Company Profile
With continuous progress anddevelopment in past two decades, now Bangwin machine is becoming the leading machinemanufacturer and solution supplier in HVAC and Refrigeration industry. Also we aredeeply involved into polyurethane foam insulation injection and spraying machine, metalwire and strip forming machine, car wheel rim machinery and cookware industryequipment, steel ball equipment, etc.We are good at turnkey project and real one-stop service. For turnkey project, we canhelp you for new workshop layout, investment plan, marketing research, cost and priceevolution, machine shipment, commissioning and the after-sale service. For reaone-stop service, one of our professional staff will always stand with you from technicalconsulting, order confirmation, production progress, quality control to final inspection,shipment, installation and commissioning.
cooperative partner
Packaging & Shipping
FAQ
1. Q: What is the power supply of the machine?A: The standard power supply in china is 380V, 3P, 50Hz. We also can customized accordingly.2. Q: What information should the customer provide to get an accurate quotation from us?A: The customer should provide the related technical requirements, drawings, pictures, industrial voltage, planned output, etc3. Q: What is the payment term A: The payment term is 30% down payment, and 70% before shipment(T/T mode), we also accept other payment term, like L/C, DA, D/P etc4. Q: What is the delivery time?A: Normally the delivery time of the machine is 30 days after receive down payment.5. Q: What is the warrantee period of the machine?A: The warrantee period is one year since the date of B/L.
>>
Zoifun Furniture Custom Frameless White Surface Glass Whiteboard Magnetic Acrylic Dry Erase White Board
>>
Mtn Industrial Cocoa Bean Rice Grain Drying Machine Gas Heating Coco Peat Biomass Rotary Silo Dryer
>>
12" Square Polished Stainless Steel Overhead Water Saving Rainfall Shower Head
>>
Fashion women Tartan Winter Gloves touch screen
>>
Adjustable Beam Bracket Solar LED Street Light
>>
China Fresh Natural Colorful Capsicum High Quality Bell Pepper for Export
>>
Factory Direct Double Door Top-Freezer Compact Home Fridge Freezer Mini Fridge Refrigerator
>>
4feet Integrated T5 LED Tube Batten Light
>>
3000b/h automatic drinking water filling bottling capping packing machine line
>>
Premium Hot DIP SGCC DC51D+Z80 Galvanized Steel Sheets for Metal Fabrication
>>
Cake Paper Packaging Muffin Bakery Swiss Roll Dessert Sweet Pastry Cupcake Box with Windows Packaging Insertand Handle
>>
mascarillas face mask
>>
Mjp150*4/5 White Rice Plan Sifter Rice Grader Rice Mill Machine
>>
Customzed Smart Control Windproof Fabric Patio Roller Blinds Exterior Installation
>>
Compound Fertilizer Rotary Fertilizer Pellet Mixing Equipment
>>
Fast International Logistics Raliway Train Shipping to Spain Belgium Netherlands UK Germany USA
>>
Ring Colored Flat Sling Polyester Lifting Belt with Double Buckles
>>
High Quality of LED Exposed Luminous Letters
>>
ASTM D4006 Water Content in Crude Oil Tester
>>
LED Lamp Portable LED Camera Light Live Fill Light Lamp