US$6.00
1,000-1,999 Pieces
Basic Info.
Quality Guarantee Period
6month
Storage Environment
Dry Environment
Product Specifications
35mmw*600mml
Transport Package
Carton & Vacuum Packing
Specification
720*150*200mm
Production Capacity
5000000pieces/Year
Product Description
PILE HEAD CUTTER("PHC")
| NAME | APPLICATION | PACKING |
| PHC(ES) | Small cut pile head | Ф500mm-Ф800mm | 600×35mm×10pcs |
| PHC(S) | Large cut pile head | Ф900mm-Ф1200mm | 700×45mm×10pcs |
| PHC(B) | Large cut pile head | Ф1300mm or more | 550×70mm×10pcs |
Bracket
| NAME | ACCESSORY |
| For PHC(ES) | Bracket type ESB | The brackets are then fixed to the steel reinforcement cage,with the PHC at the level that the crack should form in the pile head |
| For PHC(S) | Bracket type B |
| For PHC(B) | Bracket type BB/DBB |
De-bonding foam
| NAME | REMARKS |
De-bonding foam for vertical reinforcement anchor bar | There are five sizes with a diameter of 16-40mm |
How the PHC Works
1. The bonding between concrete and steel is removed by covering all reinforcement bars with de-bonding covers.
2. The PHC that is installed with the water in the concrete and expand. The expansion will cause stresses in the concrete that has set. The expansive stresses will exceed that of the compressive stress of the concrete after 3 to 4 days and hence causing a crack in the pile head.
3. The cracking of the pile head at the position of the PHC will hardly propagate below the intended cracking line.
Components
1. PHC
a) Type ES-35mmWx600mml
b) Type S-45mmlWx700mml
c) Type B-70mmWx550mml
2. Steel Reinforcement De-Bonding Covers
Various sizes - From Φ16mm to Φ40mm 3. Steel Brackets
a) Type ESB
b) Type SB
c) Type BB
d) Type DBB
4. Plastic bag
a) 5C-W130mm-L1100mm
b) 5C-W140mm-L1400mm
Installation Procedure
1. The PHC materials are fixed to the steel Reinforcement cage prior to lowering the cage into the bored hole for concerting.
2. The PHC are initially fitted to the steel brackets.
3. The steel brackets are then fixed to the steel reinforcement cage,with the PHC at the level that the crack should form in the pile head.
4. Install de-bonding covers to all the steel Reinforcement starter bars above the PHC.
5. The installation of the PHC is complete and ready to be installed into the bored hole for concreting.
Pile Head Removal
1. After concreting, wait 4 to 5 days for crack to form at the pile head.
2. When the crack at pile head has formed, the pile head can be removed by lifting it off with crane, when necessary with the aid of an excavator.
CONFIGURATION OF PHC FOR EACH PILE SIZE
Q: Why choose our product?
A: Reduce labor costs, improve efficiency, save time, reduce noise, and be more environmentally friendly.
Q: Are you a manufacturer?
A: Yes,our factory was established in 2011 and we have our own trading company.
Q: What's the MOQ and payment terms?
A: MOQ is 20 pieces. Payment via T/T.
Q: How about delivery time?
A: 15-30 work days after the payment, and also depend on your quantity.
Q: How long is the shelf life of the product?
A: In a dry environment 6-8 month.
Q: Which country have you exported?
A: Most Southeast Asian countries.
>>
3 in 1 Snap It Up Silicone Adhesive Smart Phone Wallet with Stand
>>
Taijia TM-8810 ultrasonic thickness gauge ultrasonic metal thickness gauge pipe thickness gauge
>>
X6036 Universal Horizontal Knee Type Manual Milling Machine
>>
Men Stainless Steel Metal Shaving Brush and Razor Holder Shaving Stand
>>
Foundry Carbon Cup Copper/Steel Melting Pot Clay/Silicon Carbide Sic Graphite Crucible
>>
Factory Price Upgraded Multi-Function Wireless Horn Light Type-C Bicycle Light
>>
Czz Power Window Regulator Lifter W/ Motor for Honda CRV Re2/Re4 2011-07 Rr 72710-Swa A01, 748-163, 72710-Swa-A01 Supplier Auto Parts Manufacturer
>>
Automatic Horizontal Injection Molding Machine
>>
Yogurt Milk Bottle Blow Molding Machine Automatic Extrusion HDPE PP
>>
Whole body bio scan health analyz for help screening early disease equipment
>>
Customized Multi-Cavity Injection Plastic Mould High Precision Plastic Injection Mold
>>
Used Excavator Machine Crawler Excavator Second Hand Komatsu PC200-8 Maintain Great Condition to Work
>>
Industry Leading Factory Price Great Quality High Durable Satisfaction Wholesale Power Tiller
>>
High-Speed CNC Side Hole Drilling Machine Yz-D28 for Precision Boring and Drilling Milling
>>
5SHX0660F0002 3BHE022333R0101/GVC713A101
>>
Braves Jerseys 13 Ronald Acuna Jr Baseball Jerseys MLB
>>
Horizontal and Vertical Drilling Milling Machine (ZX6350ZA)
>>
9000L Per Hour Craft Beer Yeast Deparator Disc Stack Centrifuge with Flow Meter
>>
Potato Sweet Potato Four-Wheel 2wheel Walking Farm Tractor Household Carrot Digging Sweet Potato Harvester
>>
T3 Series Residential Water Meter Ultrasonic Water Metering Ultrasonic Water Flow Sensor