Basic Info.
Type
Tube Shoulder Injection
Plastic Type
Thermoplastic
Plasticizing Way
Plunger Type
Computerized
Computerized
Speed
45~60 Pieces Per Minute
Tube Diameter(mm)
13~55 mm
Extrusion Spraying Mode
Servo Motor Control
Change Time of Head Tooling
20 Minutes
Change Time for The Orifice Pin
5~10 Minutes
Change Time of PE Color
25~30 Minutes
Specification
2400*1400*2300mm
Production Capacity
100set/Year
Packaging & Delivery
Package Size
240.00cm * 140.00cm * 230.00cm
Package Gross Weight
2500.000kg
Product Description
Extruded Tube Line (project solution)
| line #1: extruder (1/2/5/6 layer) - sorter - header (60/70/120) - sorter - printer (3/5/6/8 color)- sorter - capper(50/100) |
| | line #2: extruder (1/2/5/6 layer) - sorter - printer (3/5/6/8 color)- sorter - header (60/70/120)- sorter - capper(50/100) |
Laminated Tube Line (project solution)
| line #1: Laminates Welder (auto unwebbing) - sorter - header (120)- sorter - capper(100) |
| | line #2: Laminates Welder (manual unwebbing) - sorter - header (70)- sorter - capper(50) |
Q1:Why is the Fast PBL upgrade necessary?
New laminate developments require the Fast PBL upgrade to maintain quality. Running PBL like ABL causes issues, compromising tube quality and increasing rejection rates and costs.
Q2:Are you manufacturer?
Yes, We are the manufacturer and trading company.
Q3: What information should the customer provide to get an accurate quotation from us?
The customer should provide the related technical requirements, drawings, pictures, industrial voltage, planned output, etc
Q4: What is the payment term?
The payment term is 30% down payment, and 70% before shipment(T/T mode), we also accept other payment term, like L/C, DA, D/P etc
Q5. How long is your machine's warranty period?
All our machine have one year guarantee, starting from finished installation.
Q6. How could we do after one year warranty period?
We also can do service for you, but you need pay salary for my technician 80USD/day.
Q7. How could we do if the parts broken within warranty?
We would express the free replacement parts during the warranty date.
Q8. How do we solve the machine problem after your engineer leaving?
Generally speaking, there will be no problem after finish installing. In case you have any problem. You can contact our after sales specialist at any time.weour after-sales department with 30 engineers.Our engineers will take a solution video according your description.
>>
Self-Loading and Unloading Integrated Construction Artifact Self-Loading Concrete Mixer Truck Used Concrete Mixer Truck
>>
Qty4-26 Fully Automatic Interlocking Paver Brick Machine
>>
CNC Hydraulic Guillotine Shear Machine / CNC Hydraulic Shearing Machine/ CNC Metal Sheet Cutting Machine QC11K-16X2500
>>
copper making moulds chalk piece making machine
>>
Manufacturer Heavy Duty Extended Adjustable Link Bar Kit Stabilizer Bar for FB 2012-2016 Sway Bar
>>
Marathon Running Race Sports Chip Timing Runner Number Bib Tag
>>
Standing Corten Steel Drop Box Parcel Newspaper Box Large Mailbox
>>
Lower Price Top Quality Heated Soft Military Wool and Polyester Relief Blanket
>>
2018 Seond Hand Sany 62m Pump Truck Pumping Concrete Machinery
>>
Finn Power Hose Crimping Machine Price Pipe Tube Making Machine for Sale
>>
New Design Handbag Embellished Structured Fashioin Shoulder Bag PU Leather Bag
>>
Smiger Affordable Portable Digital Piano
>>
14m High Reach Crawler Hydraulic Scissor Lift for Extended Use
>>
New Type 2 in 1Car Windshield Suction Cup 360 Mobile Phone Holder Mobile Phone Accessories Holder
>>
Wood Box & Bamboo Box & Gift Box & Wine Boxes & Wooden Gift Box & Storage Box for Organizer Box
>>
Chemical Reagents 2,4,6-Tri-(6-aminocaproic acid)-1,3,5-triazine corrosion inhibitor
>>
01B155MGR split bearings Long life and durability
>>
Gravimetric Plastic Mixer Masterbatch Blender Color Mixing
>>
Corn Germ Meal
>>
Tungsten Carbide Grinding Rotors Ideal on Bead Mill and Sand Mill