Product Description
Product Description
Product Description
1. BTE Number:604740
2. Ref. Number:
Ruville | 57013 |
INA | 531010820 |
GMB | GT20010 |
Gates | T41029 |
Dayco | ATB2112 |
Optimal | 0-N073 |
QH | QTT336 |
SNR | GT370.00 |
TIMKEN | TKR9073 |
BREDA | CR5054 |
Febi | 17491 |
Ford | 3 895 178 |
Ford | XM34 6K254 CA |
KIA | 0K972-12-700 |
KIA | OK97212700 |
KIA | 0K972-12-700A |
KIA | 0K973-12-700 |
KIA | 0K973-12-700A |
KIA | OK97212700A |
MAZDA | FE1H12700A |
MAZDA | FE1H12700 |
3. Size: 65*28.5
4. Application Car Model: Ford, KIA, MAZDA
Packaging & Shipping
1. NEUTRAL package.
2. BTE Box + Carton + Sea Worthy Pallet
3. Customerization packing
Our Services
1. Sample: free sample for the customers to test our quality.
2. Guaranty: 60,000 kilometers or 2 years after the shipment
3. logo: free laser marking of your logo
4. Package: Natural packing or Customerization packing
Company Information
1.Managemant System: ISO9001.
2.Delivery: 45 days after receiving prepayment.
3.Guaranty: 60,000 kilometers or 2 years after the shipment.
4.Design and Development: 45-60 days for new items aganist the sample.
5.Exhibition: Frankfurt exhibition in Shanghai each year,China Construction machinery exhibition and 3-5 for the oversee exhibition for Auto parts.
6. Market: European,South American and Asian.
FAQ
1. Q: What's about your brand and package?
R:We can offer two different business solution: A, BTE brand, BTE code and BTE packing; B, customer’s brand, code and packing. For the customer’s packing, we have to ask for the reasonable quantity and charge the additional costs.
2. Q: Which kind of the bearing do you used in your tensioner?
R: Most of our tensioner are used the Chinese bearings. We can also use the Japanese bearing, however the costs of the bearings are very expensive. We suggest you to use the Chinese bearings, all these bearings are well controlled for the auto application. The grease is ESSO N3 or, Korean grease TP3200.
3. Q: The delivery time of our new order
R: The general delivery time is about 45 to 65 days after the order confirmation. This delivery date is the on board time in China, not the arrival time. We are also trying to supply our customers from our stocks. Most of our stocks are the spare part, we are not able to give an exact stock list. We need to check the delivery date according to the quantity and our production plan.
4. Q: What's about your payment item?
R: The payment term is L/C sight or T/T in advance. The normal term is TT 50% against the order and TT 50% before the shipment date.
>>
55566598 For cruze 1.8 Connecting Rod
>>
Stainless Steel Check Valve Russia Made in China Check Valve
>>
2022 New Premium Dental Implant Collagen Membrane for Innovative Dental Implants
>>
UNS2882A 3BHE003855R0001 ABB module inventory spot sale
>>
Yuxing Motorcycle Spare Parts Maintenance-Free 12n5-BS 12V5ah Motorcycle Battery for Motorbike
>>
21ton Hydraulic Wheel Excavator with 0.9 Cbm Bucket and Spare Parts
>>
VH Series V Type High Efficient Mixer
>>
Disposable waterproof bed sheets (PE composite film) 60cm*100m
>>
160 Inch Weaving Sound Penetrating Projection Screen Fixed Frame Curved Projector Screen
>>
2 color flexo printing machine for carton
>>
Willing OL200 New A4 Cold Pouch Laminator Office Laminating plastic laminator machine roll
>>
regeneration device cation filter PA810-001D for India power system
>>
Weijia 6"/8"/9"/10" Dinner Dishes Plates Woven Wood Plate
>>
customized reusable stand up food liquid spout pouch for beverage
>>
A312 Smls Stainless Steel Pipe (304H Tp304H 304 316 310 347 2205)
>>
Light Transmission Meter Car Solar Film Transmission Tester WTM-1000
>>
GAPV HOT SALE CAR DOOR HANDLE For KIA K5 82610-2T000 2011-2015
>>
50 Tons Single Head Hydraulic Rubber Product Making Making Machinery
>>
Wall Mounted Coin-Operated Breathalyzer for Public Places (AT319)
>>
Metal Hole Drill Machinery Z3050X16 Full Hydraulic Auto Feed Radial Drilling Machine