
| US$3,000.00-10,000.00 | 1 Set (MOQ) | 
| product Name | Taizhou Professional Making Plastic Water Jug Mold | 
| Product material | pc/pp/abs | 
| Core& Cavity Steel | 718etc | 
| Steel hardness: | HRC34-38 | 
| Mould Standard | DME, HASCO, LKM, etc | 
| Cavity Number | 1 | 
| Injection System | direct gate | 
| Ejector System | stripper plate | 
| mould base | S50c | 
| Cycle Time | 50 s | 
| Tooling lead time | 60DAYS | 
| Mould life | 500, 000 to 1, 000, 000SHOTS | 
| Quality assurance | ISO9001 | 
| Specification | According to client' s requirements | 
| Our Advantage | 1. High quality | 
| 2. Reasonable price | |
| 3. On time delivery | |
| 4. Good After-sale service | |
| 5. Strict quality control | |
| 6. All the mould are automotic. | |
| Offer you | In-time response on letters, telephone calls or fax | 
| In-time supply the quotation and mould designs | |
| In-time communication on the technical points | |
| In-time sending pictures for the mould machining progress and mould finishing schedule | |
| In-time mould test and sample delivery | |
| In-time mould delivery. | |
| plastic mould | |
| 1. Samples/Drawing & Requirement from you | |
| 2. Mould design: we will Communicate& Exchange the opinion with you after you place order. | |
| 3. Material Purchase: Steel cutting and Mould base tooling. | |
| 4. Assembling. | |
| 5. Inspection of mould: following and controlling the tooling processing. | |
| 6. Mould testing: We will inform you the date. Than will send the sample' s inspection report& injection parameters with the sample to you! | |
| 7. Your instruction & confirmation for shipment. | |
| 8. Ready made mould before packing. | |
| For more information please contact us. | |