|
US$3,500.00-22,000.00
|
1 Set
(MOQ)
|
Basic Info.
Certification
ISO 9001:2000, CE
Suitable for
Copper, Aluminum, Alloy, Carbon Steel, Stainless Steel
Transport Package
Exported Standard Packing
Production Capacity
234 Sets/Year
Product Description
ZFY MACHINE MANUFACTORY (ANHUI) CO., LTD Product Description
Standard Configuration
Product Parameters
Company Profile
Packaging & Shipping
Our Customers
We are a team
FAQ
1. How about our after-sales service?
ZFY exclusive overseas engineers on-site service.
24-hour telephone line and video conference are available for any questions.
We have an experienced team of service technicians for work-hard solutions.
2. Can you supply the relevant documentation?
Of course, we can provide most documentation including Certificates of Analysis /Conformance; Product quality certificates; BL; CO, and other export documents where required.
3. What is the average lead time?
Actually, We have a lot of standard machine tools in stock in order for faster delivery, and they can be shipped within 3 days once confirmed the order. For mass production, the lead time is 15-25 days. If our lead times do not work with your deadline, please go over your requirements with your sale. In all cases, we will try to accommodate your needs. In most cases, we are able to do so.
4. What kinds of payment methods do you accept?
You can make the payment to our bank account by TT, LC at sight, and LC after sight. Such as 30% deposit in advance, 70% balance against the copy of B/L but open to negotiation.
5. What is the product warranty?
We warranty our materials and workmanship. Our commitment is to your satisfaction with our products. In warranty or not, it is the culture of our company to address and resolve all customer issues to everyone's satisfaction.
6. Do you guarantee safe and secure delivery of products?
Yes, we always use high-quality export packaging. We also use specialized hazard packing for dangerous goods and validated cold storage shippers for temperature-sensitive items. Specialist packaging and non-standard packing requirements are provided by us for free.
7. How about the shipping fees?
The shipping cost depends on the way you choose to get the goods. Express is normally the quickest but also the most expensive way. Sea freight is the best solution for big amounts. Exactly freight rates we can only give you if we know the details of the amount, weight, and way. Please contact us for further information.
>>
Customized 7.0 Inch 800X480 Touch Screen LCD Display RGB 40pin LCD Display
>>
Efficient Helical Bevel Planetary Gearbox Solution for High Torque for Concrete Mixing
>>
Lab Multi-function Power-driven Soil Proctor Compaction Testing Equipment /Soil Electric Compaction
>>
Marine D Rubber Fender for Ship Side Protection
>>
Wholesale Virgin Delrin POM Sheet POM ESD Sheet/Rod
>>
Disposable Eco-Friendly Rectangle Kraft Paper Bowl Lunch Box with Lid
>>
CNC Milling Machine CNC Machine and Torno CNC Unlocking 3/4/5 Axis Capability in Stock
>>
Foska 14 Inch Oxford Cloth Business Laptop Computer Bag
>>
Ultrasonic NDT Concrete Hardness Test Hammer Price
>>
Modern Design Wooden Rotational Side Table Sofa Laptop Table With Wheels
>>
Bifold Windows and Doors Double Glass Australian Standard New Modern Aluminum Folding Doors Aluminum Alloy
>>
High-Speedaccuracy Bench Drilling Machine Z406CD/Z406bd
>>
Customized FAW 70m Concrete Pump with Truck Boom Concrete Pump Truck
>>
Low Price OEM ODM Factory Direct Sales Cat Sand Strong Clumping High Quality Bentonite Cat Litter
>>
Rotary Blow Molding Machine PP PE Bottle Maker Used Plastic Injection Blow Molding Machines
>>
Chinese Portable Automatic Magnetic Pipe Cutting Machine Cg2-11
>>
Customized Investment Casting Motorcycle Auto Spare Parts
>>
Hered Self-Propelled Tracked Crawler Electric Scissor Lift for Complex Ground Battery Powered Hydraulic Lift Platform
>>
Hansshow Right/Left Power Electric Tailgate Strut OEM 51247332696 51247332695 for bmw X5 E70 E70LCI 2007-2013
>>
Permanent Catheter for Dialysis Double Lumen Catheter Kit