Basic Info.
Type
Tube Shoulder Injection
Plastic Type
Thermoplastic
Plasticizing Way
Plunger Type
Computerized
Computerized
Speed
85~120 Pieces Per Minute
Tube Diameter(mm)
16~60 mm
Extrusion Spraying Mode
Servo Motor Control
Change Time of Head Tooling
18~23 Minutes
Change Time for The Orifice Pin
20~25 Minutes
Change Time of PE Color
30~35 Minutes
Specification
3470*2900*2490mm
Production Capacity
100set/Year
Packaging & Delivery
Package Size
347.00cm * 290.00cm * 249.00cm
Package Gross Weight
4500.000kg
Product Description
Extruded Tube Line (project solution)
| line #1: extruder (1/2/5/6 layer) - sorter - header (60/70/120) - sorter - printer (3/5/6/8 color)- sorter - capper(50/100) |
| | line #2: extruder (1/2/5/6 layer) - sorter - printer (3/5/6/8 color)- sorter - header (60/70/120)- sorter - capper(50/100) |
Laminated Tube Line (project solution)
| line #1: Laminates Welder (auto unwebbing) - sorter - header (120)- sorter - capper(100) |
| | line #2: Laminates Welder (manual unwebbing) - sorter - header (70)- sorter - capper(50) |
Q1:Why is the Fast PBL upgrade necessary?
New laminate developments require the Fast PBL upgrade to maintain quality. Running PBL like ABL causes issues, compromising tube quality and increasing rejection rates and costs.
Q2:Are you manufacturer?
Yes, We are the manufacturer and trading company.
Q3: What information should the customer provide to get an accurate quotation from us?
The customer should provide the related technical requirements, drawings, pictures, industrial voltage, planned output, etc
Q4: What is the payment term?
The payment term is 30% down payment, and 70% before shipment(T/T mode), we also accept other payment term, like L/C, DA, D/P etc
Q5. How long is your machine's warranty period?
All our machine have one year guarantee, starting from finished installation.
Q6. How could we do after one year warranty period?
We also can do service for you, but you need pay salary for my technician 80USD/day.
Q7. How could we do if the parts broken within warranty?
We would express the free replacement parts during the warranty date.
Q8. How do we solve the machine problem after your engineer leaving?
Generally speaking, there will be no problem after finish installing. In case you have any problem. You can contact our after sales specialist at any time.weour after-sales department with 30 engineers.Our engineers will take a solution video according your description.
>>
Original New Excavator PC240-11m0 PC260LC-11m0 PC330-11m0 with Warranty
>>
Factory Price LSZH FRP/Steel Optical 1/2/4 Core Flat FTTH Indoor/Outdoor Drop Fiber Optic Cable
>>
7 1/2
>>
Wholesale Nordic Modern Luxury Decorative Bedroom Table Lamp Ceramic Floor Lamp Pendant
>>
High Quality 25L Remote Control Pesticide Spray Drone for Agriculture
>>
BABY Organic Bamboo Rayon Baby Beanie Soft Knotted Caps
>>
Hot Air Tube Bundle Dryer
>>
Mindray Original spare parts BS200 cuvette plastic reaction cuvette
>>
Good Price 56cbm 60cbm LPG Tank Trailer LPG Semi Trailer Tanker
>>
5Cr21Mn9Ni4N Low nickel Austenitic non-magnetic stainless die steel HRC28-30
>>
Powder Detergent, Washing Powder Making Formula
>>
Supply of high hardness stone crusher pebble granite crusher multi cylinder hydraulic spring cone crusher
>>
Portable wireless Integrated floor thickness gauge On Construction
>>
Bond Strength Tester/Most advanced bond testers
>>
Aluminum alloy radiator
>>
Electric whisk Handheld household and flour whisk
>>
Automatic PET bottle blow moulding machine price with air compressor machine
>>
New Fashion Custom Logo Printed Neoprene Can Cooler Drink Stubby Holder
>>
HC-Q001 High Quality ophthalmology medical devices slit lamp microscope for sale
>>
Cameroon Poultry Farm A Type Automatic Laying Hen Cage & Egg Hen Coop & Chicken Coop with 90-200 birds in Chicken Coop