Welcome to visit

China Factory Good Price Easy to Be Adjusted and Smooth Products Surface Spc/Lvt Flooring Board Extrusion/Extruder Screw and Barrel Machine Spare Parts Mould

US$7,500.00
1-2 Pieces
US$7,150.00
3+ Pieces

Basic Info.

Model NO.
RFS1050/1350
Standard
GB
Technics
Forging
Material
Metal
Category
Spc
Plating Thickness
0.06-0.08mm
Power Supply Voltage
220V
Temperature Controlled Area
12 District
Die Body
16*280
Side Plate
16*180
Transport Package
1.5 * 0.68* 0.6 M
Specification
1050mm
Trademark
ROMEROCA
Origin
China
HS Code
8480790090
Production Capacity
10 Sets/ Month

Packaging & Delivery

Package Size
150.00cm * 68.00cm * 60.00cm
Package Gross Weight
200.000kg

Product Description

Product Description
MOULD FOR SPC FLOORING EXTRUSION MACHINE
ROMEROCA Mould Specification
Model
1050/1350
Category
SPC
Plating thickness
0.06-0.08mm
Power supply voltage
220V
Temperature controlled area
12 district


ROMEROCA Heating Rod Specification
Die Body
16*280
Side Plate
16*180

ROMEROCA Fastening Screw Specification
Die Body
M36*130
Die Lip
M20*100
Side Plate
M20*80/M16*50

ROMEROCA Heating Zone and Power
Area Code
1/6
2/7
3/8
4/9
5/10
11/12
Number of Heating Rods
3
3
3
3
3
3
Power(KW)
2.1
2.1
2.1
2.1
2.1
1.4

Detailed Photos
Our Advantages

Our factory has advanced CNC machining center, Taiwan large scale precision flat grinder, radial drill and other complete mould manufacturing equipments. We are professional in development and design of plate moulds, products machining and manufacturing, as well as after sale service and track services.
Sharpened tools help to do good work, we have advanced manufacturing technology and equipments, advanced equipments and technology provide reliable guaranty to be geared to international standards.
Mould Installation and Assembling
--Use the specially designed hoisting holes on the mould and the hoisting ring equipped with the mould to lift the mould from the packing box. The operator must clarify the weight of the mould and the limit lifting weight of the lifting device.

--Lift the mould into the production line and install it on a mould support (Stand) with a suitable height.Carefully adjust the height so that the inlet end of the mould is connected to the extruder Use a uniform torque to tighten the connecting screws.

--The fastening screws of the connecting flange should be tightened at the corners, otherwise the assembly surface will be uneven due to the pressure deviation, resulting in melt leakage during the extrusion process.

--install the power cord and temperature measuring device (thermocouple) equipped with the mould, make sure that the power cord is connected correctly, and make sure that the temperature measuring device is safely inserted into the bottom of the measuring hole.

--Before production, check all connection lines again, check and approve the equipment safety devices and control system equipment, and whether the temperature and pressure control system settings are appropriate.

Mould Warming --Do a good job of preheating and heat preservation before production. In order to achieve uniform preheating and reduce heat loss, it is recommended that heating be carried out step by step. Set the heating temperature to 100° C for the first time and keep the temperature for 30 minutes; set 150° C for the second time and keep the temperature for 30 minutes; from setting to the required process temperature, keep the temperature for more than 30 minutes before entering normal production.

--Tighten the mould at a temperature of 150° C, first align the mould head, and then align the side plate and the feed port connecting screws. The fastening screw of the mould body should firstly tighten the screw in the middle of the mould, and then operate to both ends in turn, alternating left and right.

--Under working temperature, calibrate the thermocouple to keep the temperature of each zone uniform and constant, and avoid temperature fluctuations in the range. Unstable temperature factors will have a greater impact on the viscosity and fluidity of the material.

--In order to compensate for heat loss or lack of material flow at the end, the temperature of each zone of the mould can be appropriately increased.


Production Trail
--The die lip fine-tuning mechanism is in a natural state when leaving the factory, and should be adjusted to the set value according to the product requirements. The fine-tuning screw should be in a compressed state, and the size of the die lip opening can be adjusted through multiple screws to avoid large-scale adjustment of a single screw and multiple adjustments on each screw.

--Turn on the extruder, check whether the thickness and flow rate are uniform, adjust the die lip appropriately, and adjust the screws to make the material flow distribution. The adjustment method

refers to the technical drawing (appendix) of the manual. After the upstream and downstream equipment and products are completely normal, it will enter continuous production.

--Turn off the feed, reduce the speed of the extruder, and add cleaning material until the cleaning material is extruded from the mould. Turn off the power supply of the production line, stop heating, and clean the inside and outside of the mould thoroughly. If the mould is no longer used for a period of time, use wooden strips and other soft materials to seal the inlet and die lip, and take corresponding protective measures (such as rust, dust, moisture, etc.) for future use .

Mould Maintenance
--We propose that the extrusion mould be completely disassembled after six months of use, cleaned and maintained, and inspected related equipment. All damaged parts (screws, bolts, heating rods, leads, etc.) should be replaced in time. However, main maintenance, The maintenance time should be determined by related issues such as processing materials and production cycle.

--The disassembling, cleaning, overhaul and maintenance of the mould should be carried out by qualified engineers. For any questions about mould maintenance , please contact us in time for consultation.




>> GF-3017 Automatic Gantry Machining CNC Aluminium Milling Machine Center Big Discount
>> Sierra Wireless LTE 4G Modules EM7330
>> Wholesale High Security Galvanized PVC Coated Chain Link Fence with Barbed Wire on Top Fencing
>> decorative perforated metal sheets/building material/decorative mesh
>> Customized 3 Layers / 4 Layers Laborary Eco-Friendly Biohazard Medical Sample Dental Kangaroo Transport Collection 95kpa Zipper Specimen Bag
>> Pall HFU640UY400H13 HIGH FLOW Cartridges for RO system
>> Manual Small Diesel Vibrating Soil Hollow Cement Laying Block
>> KB090CP0 Inch Size Thin Section Bearings KB090CP0 Thin Section Open Bearings KB Series 228.6X244.475X7.938mm
>> Concrete Batching Plant 60 Cubic Meter Nigeria Ready Mix Concrete Plant for Sale
>> Best Choice Exceptional Quality Modern Tubular Steel Railing Outdoor Indoor Metal Railing From China Manufacturer
>> Muffler Insulator Support Exhaust For Toyota 2018-2020 Camry/Hybrid For Lexus ES240 ES250 ES350 ES300H 2018-2020 OEM 17566-25010
>> Yoghurt Plastic Cup Foil Lids
>> China to Czech/USA Best Sea Freight Shipping Agent, Freight Forwarder/Logistics
>> High Quality Digital Amplifier Professional Karaoke Car Audio 05t
>> Upper Tail Lamp Bus Rear Light for Higer Bus Chinese KLQ klq6119 Bus Spare Parts 37V11-31200B 37V11-31100
>> Modern Art Decorative Unique Large Chandelier Hotel Lobby Indoor Restaurant Golden Luxury Crystal Pendant Lamp
>> Sdcad Brand High-Efficiency Three-Phase Asynchronous Vibrating Screen Motor for Concrete Vibrator Construction Vibrator Motor
>> Car Mixer Concrete Batching Plant Ready Mix Concrete Plant
>> Customized Nickle Plated Split O Shape Key Rings for DIY Keychains
>> Non-GMO Japanese Food Ingredients Supplier IQF Frozen Edamame in Pods & Green Soybeans (Mukimame, Shelled Edamame, Green Soybean Kernels also Available)