US$10,000.00-400,000.00
|
1 Set
(MOQ)
|
Basic Info.
Plastic Type
Thermoplastic, Tube Head Injection
Plasticizing Way
Screw Type
Clamping Way
Hydraulic & Mechanical
Computerized
Computerized
Certification
CE, ISO9001:2008
Distance Between Tie Bars(Width)(mm)
635 mm
Screw Speed (Rpm)
0 - 350 Rpm
Ejector Stroke(mm)
100 mm
Screw Diameter (mm)
55 mm
Mold Height(mm)
250 - 670 mm
Applicable Industries
Manufacturing Plant
Core Components
Motor, Pump, Gear, PLC, Screw, Direction Valves
Showroom Location
Egypt, Turkey, Italy, Saudi Arabia, Pakistan
Shot Volume (Theoretical)
593 Cm3
Injection Weight (PS)
540g/642g
Production Capacity
500 Set/Sets Per Year
Product Description
HJ/360BA High Speed Plastic Injection Making Molding Machine
Product Description
Specification
Machine model
| HJ/360BA
|
Screw type
| A
| B
|
Screw diameter (mm)
| 55
| 60
|
Screw L/D ratio (L/D)
| 27
| 24.8
|
Shot volume (theoretical) (CM3)
| 593
| 706
|
Injection weight (PS)(g)
| 540
| 642
|
Pump max.pressure (Mpa)
| 19/16
|
Pump motor power (servo)(KW)
| 40+40
|
Number of heating area(Segment)
| 3+1
|
Machine dimension (L*W*H) (M)
| 7.6*1.79*2.36
|
1. What kind of plastic material can be used on this machine?
PP, PE, PS, ABS and other general material could be used on this machine.
If you have other special material such as PC, PMMA, PVC, please contact us for further information. 2. What is guarantee time for this machine?
12 months after installation or 18 months again B/L date.
3. What kind of shipping container for this machine?
Containere choose will depends on the different machine size . 20HQ,40HQ,40GP will suitable for different size machine.
4. How much is Engineer service charge?
We can send experienced technician to customer's country for guiding the installation and commission the machine, also train the
customer's employee. Customer need to afford technician visa charge, round trip air ticket expense, accommodation and
transportation in local. Also customer needs to pay USD 80 per days to technician as salary.
5. How long will be for installation and commission this machine?
If customer prepare all necessary thing such as power supply, water supply, hydraulic oil, plastic material, plastic mold,
installation and commission period will be within 7days including training customer's employee.
6. How many workers are needed to operate this machine?
One worker only.
7. What is the power consumption for this machine?
Power consumption is determined by the product. Different product requests different power consumption.
>>
Anti Static Raised Floor with HPL/PVC/ Vinyl Covering for Data Center and Computer Room 600*600
>>
Flat Supersonic Airflow Micronizer for Animal Feed
>>
SAINT-VIEW 2021 Orchid Flower Series Crystal Arabic Cawa Coffee Cup for EID Giveaways
>>
OEM/ODM Canoe Kayak Cheap Plastic Fishing Boats Inflatable Boat Fishing Kayaks
>>
Murr 7000-41441-0000000 Adaptor M12 Male on Rear / Msud Valve Plug a-18mm
>>
Emersongear Army Style Bdu Tactical Clothing Waterproof Tactical Uniform
>>
Hog Floor Mesh
>>
Supplier Infrared Red Light Therapy Horseshoe Triple Core Pain Relief Therapy
>>
A3 Digital Printer UV Dtf 30cm Crystal Label Machine Print Ab Film for Cosmetic Bottle Glass
>>
Automatic Facial Tissue Folding Machine Cheap Facial Tissue Paper Making Machine
>>
Restaurant Disposable Twins Chopsticks with OEM Package Chinese Bamboo Chopsticks
>>
Customize Diving Equipment Scuba Shearwater Aluminum Stainless Steel Bcd Backplate
>>
Basic Customization Carbon Steel Removable Plate Heat Exchanger
>>
Hand Painting Flower Oil Painting O Crafts
>>
Eco-friendly GRS Woven 75D*150D 3/1 Twill 100%RPET Recycled Polyester Oxford Fabric for luggage bags
>>
Premium Quality 2 sections glass fiber reinforced plastic joint soft tail raft rod fishing rod byloo fishing gear wholesale
>>
Mini Type K Flat Pin Thermocouple Male Female Thermocouple Connector
>>
AEBI Garden machinery Air Filter 104.0860,129939-12621,05821326
>>
europe standard door modern windows door
>>
Voice Sound Sensor Table Atmosphere Lamp Pickup Music Recognition LED Rhythm Light