Basic Info.
Automatic Grade
Automatic
Certification
CE, ISO 9001
Workpieces
H Beam; U Beam; Channels
Drill Bit
3 Pics (Top, Left and Right)
Max. H Beam Size
1250X600mm
Max. Drilling Diameter
40mm
Max. Drilling Thickness
80mm
Drilling Speed
120-560rpm
Transport Package
1*40hq and 1*40gp Container + Wooden Box
Production Capacity
50 Set/Year
Product Description
Product Description
Hot sale three spindle CNC drilling machine for beams
Applicable Industry:
Used for the drilling processing of H-shape steel, box beam and channel steel of steel structure, bridge, three dimensional garage and petrol platform. It is designed for medium size steel fabricators desiring to increase profitability and throughput (tons-per-month) in today's extremely competitive market.
Advantages of this machine:
1. Three spindle drilling, 3D drilling- Top, Left and Right;
It can drill one group holes without moving the workpieces, promise the precision of holes.
2. This machine equip with the automatic feeding carriage system, can feed the workpieces to the machine automatically, also promise the precision.
3. With strong loading and unloading conveyors.
Specification:
| Model | TSWZ1250 |
| Workpiece size | H-beams Max. (web height×flange width) | Max. | 1250x600 |
| Min. | 150x75 |
| Length (mm) | ≥2000 |
| Max.thickness(mm) | 80 |
| Drill dia. (mm) | Vertical drilling | Φ12~Φ40 |
| Horizontal drilling | Φ12~Φ40 |
| Spindle units | Qty. of spindle | One spindle on each of three sides (top,left,right) Total: 3 spindles |
| Rotation speed (rpm) | 120~560 |
| Spindle motor power(kW) | 3x4 kW |
| Max. feeding stroke (mm) | Left,Right:140 Vertical: 325 |
| Feeding speed(mm/min) | 20~300 |
Movement of left/right spindle (mm) | In the direction of workpiece length::520 |
| Above vertical base-level:30~570 |
Movement of top spindle(mm) | In the direction of workpiece length:520 |
| Beyond horizontal base-level:45~1160 |
| Marking | Qty. of characters | 36 characters |
| Character size(mm) | Φ10 |
| Overall dimensions(LxWxH)(mm) | About 4800x3050x3520 |
| Total power (kW) | 34 |
| Machine weight (Kg) | About 8000 |
Products Show
Our Service Installation:The seller shall send one engineer to the buyer's country for installation, commissioning and training. The buyer is responsible to provide all necessary equipments for handling and lifting the machine parts before seller's engineers go to the buyer's plant. In addition, the buyer should provide workers to support in installation activities, under supervision from the seller's engineers.
Commission:The Supplier should give drawings and other details of material/preparation required for installation of machinery which the buyer has to prepare and keep ready before the machine arrives at the buyer's factory. Installation and commissioning can be finished within 10-15 days for above machine generally.
Training:Training will include training on computer programming, machine operation and troubleshooting. The training time is at most 5 days for this machine.
The buyer should arrange no less than two people for accepting training. After training, the buyer should sign the "Receiving & Inspection Report" supplied by the seller to demonstrate the successful finish of commissioning and acceptance of the buyer.
Our Company Factory: With the development of SUNRISE, now our company has occupied important position in this industry. Due to the orders and sales performance is continuously improving, in order to better development, to meet customer's demand, and to provide customers high-quality equipment with the shortest time, our company have bought the new site, the area about 50,000 square meters, this will make sufficient preparation for development of our company and every customer.
Workshop:Quality make brand, honesty win market, harmony converge talents, and innovation promote development. Our ability to consistently provide innovative, high quality products that outlast and outperform the competition, is why we are the one of the most successful companies offering the most advanced and productive solutions in the CNC machine industry.
Warehouse:Manufacturing customer oriented products has always been our supreme concern. We believe that quality is the soul of an enterprise forever. Therefore, we never compromised with the quality of our products. We adopt advanced, scientific modern management ideas and system to realize supervisory control among all aspects of produce, inspection, sale and service etc., which help control quality, increase work efficiency and guarantee products' stability, reliability and precision. Therefore, the enterprise can achieve rapid and sustainable development.
Team:We are a team of experienced and dynamic professionals who are experts in handling precision work through scientific processes. The professional excellent talents unite a powerful and creative team of design, research and development, which build our solid technical strength and competitiveness. And our company is developing fast and supply specialized service to all customers.
Packing & Delivery
Packing Details : Packing, this model need 1*40HQ + 1*40GP;
Delivery Details : 60-90 days after get the first payment.
1. Special logistics packaging
2. Suitable carton size
3. Fasten
4. Professional placement
5. Professional shock
6. Complete package
Our Certifications
SUNRISE is focus on quality and company's image. We win market with good quality and service. The company has already passed International Quality Management System ISO9001:2008 certification for many years and also got the CE certificate, smoothly got the title of High and New Tech Enterprises. And has more than ten own intellectual property rights and patent technology. We have own import and export right. Our products exported to Russia, South Asia, South east Asia, Middle East, South America, Africa, Australia, Eastern Europe etc.
Customer Photo SUNRISE CNC MACHINE ALL OVER THE WORLD, HAVE EXPORTED MORE THAN 30 COUNTRIES.Our products exported to Russia, Ukraine, Albania, Romania, Iran, Israel, Jordan, Turkey, Uzbekistan, Egypt, UAE, Saudi Arabia, Lebanon, Mexico, Argentina, Brazil, Morocco, South Africa, Kenya, India, Australia, Indonesia, Vietnam, Sri Lanka, Singapore, Malaysia, Thailand, Myanmar etc.
FAQ Q: Are you trading company or manufacturer ?A: We are professional manufactutrer, have in this line about 10 years.
Q: How long is your delivery time?A: Generally it is 7-10 days if the goods are in stock. or it is 60-90 days if the goods are not in stock.
Q: What is your terms of payment ?A: Payment 30% T/T in advance ,70%balance before shippment.
If you have another question, pls feel free to contact us as below:
More information, please contact:
QUALITY MAKE BRAND, HONESTY WIN MARKET !
>>
Waste Cable Copper and Plastic Insulation Grinding and Separation Separator Recycling Machine
>>
Siheng Motor Factory CE Quality 80mm 750W 3000rpm 2.4nm 48VDC Integrated DC Servo Motor and Driver with Canopen
>>
Innovative PS Material Production Line for Efficient Foam Sheet Extrusion
>>
Customized DIY Coloring Books Colouring Set Kids Coloring Filling Book Children Drawing Painting Book
>>
20kg 50kg 100kg Induction melting furnace for melting copper, iron and steel
>>
20d 78d 90d Aspheric Lenses, Manufacturing Optical Lenses Aspherical Lens
>>
ABB PM856 3BSE018104R PM810U2 3BSE013220R1 Processor Unit CPU Module
>>
Japanese wooden food bento lunch box for sale
>>
Food Lactose Egg Powder Industrial Cone Screw Dry Mixer Blender Machine
>>
Electric Water Gun for Kids Automatic Water Gun Battery Waterproof Water Shooting Toys
>>
Handheld Type Digital Laser Tachometer Vicimeter Speedometer Rpm Meter
>>
Office Furniture Metal Filing Cabinet
>>
Hydac Pressure Sensor EDS3448-5-0250-000 EDS3446-3-0250-000 HDA-4840-A-350-424 HDA4846-A-250-000
>>
FORST Industrial Galvanized Metal Dust Collector Filter End Caps
>>
Doner Box Machine
>>
High-Performance Customized Stainless Steel Flange for Auto Engines
>>
56W+56W Stainless Steel Best-Selling Modern Crystal Chandelier Body Size 600+400+200mm Indoor Lighting Double-Color Light Source
>>
SS Filter Cylinder Mesh
>>
Car Auto Spare Parts for Ford Explorer TK4390-4 Timing Kit OEM 9-0387SKVVT 1L2Z6L253AA
>>
10L (Double station & Double head & with view stripe & with Double layer) Blow Moulding / Molding Machine