Basic Info.
Type
Tube Shoulder Injection
Plastic Type
Thermoplastic
Plasticizing Way
Plunger Type
Computerized
Computerized
Speed
85~120 Pieces Per Minute
Tube Diameter(mm)
16~60 mm
Extrusion Spraying Mode
Servo Motor Control
Change Time of Head Tooling
18~23 Minutes
Change Time for The Orifice Pin
20~25 Minutes
Change Time of PE Color
30~35 Minutes
Specification
3470*2900*2490mm
Production Capacity
100set/Year
Packaging & Delivery
Package Size
347.00cm * 290.00cm * 249.00cm
Package Gross Weight
4500.000kg
Product Description
Extruded Tube Line (project solution)
| line #1: extruder (1/2/5/6 layer) - sorter - header (60/70/120) - sorter - printer (3/5/6/8 color)- sorter - capper(50/100) |
| | line #2: extruder (1/2/5/6 layer) - sorter - printer (3/5/6/8 color)- sorter - header (60/70/120)- sorter - capper(50/100) |
Laminated Tube Line (project solution)
| line #1: Laminates Welder (auto unwebbing) - sorter - header (120)- sorter - capper(100) |
| | line #2: Laminates Welder (manual unwebbing) - sorter - header (70)- sorter - capper(50) |
Q1:Why is the Fast PBL upgrade necessary?
New laminate developments require the Fast PBL upgrade to maintain quality. Running PBL like ABL causes issues, compromising tube quality and increasing rejection rates and costs.
Q2:Are you manufacturer?
Yes, We are the manufacturer and trading company.
Q3: What information should the customer provide to get an accurate quotation from us?
The customer should provide the related technical requirements, drawings, pictures, industrial voltage, planned output, etc
Q4: What is the payment term?
The payment term is 30% down payment, and 70% before shipment(T/T mode), we also accept other payment term, like L/C, DA, D/P etc
Q5. How long is your machine's warranty period?
All our machine have one year guarantee, starting from finished installation.
Q6. How could we do after one year warranty period?
We also can do service for you, but you need pay salary for my technician 80USD/day.
Q7. How could we do if the parts broken within warranty?
We would express the free replacement parts during the warranty date.
Q8. How do we solve the machine problem after your engineer leaving?
Generally speaking, there will be no problem after finish installing. In case you have any problem. You can contact our after sales specialist at any time.weour after-sales department with 30 engineers.Our engineers will take a solution video according your description.
>>
Lorawan NB-IoT Smart Ultrasonic Water Meter AMR
>>
Piesia 2LAN 6*COM RS232/RS485 Embedded Computer Case Core I5 1135g7 / I7 1165g7 DDR4 11th Gen Can X86 Industrial Fanless Mini PC
>>
Sesame Harvestingrice Harvester Combinecorn Harvester Tractor Mounted
>>
Best Selling 100% Plain Woven Solid Dyed Anti-Static Linen Fabric for Clothing
>>
Thread bar making machine, screw thread rolling machine
>>
Wig Making Machine Sewing Household Wig Sewing Machine Professional
>>
Hot Sell Double Shaft Waste Tire Crusher for Tire Recycling Machine
>>
Anti-microbial Small Head Super Soft Bristles Toothbrush Cepillo Dental For Sensitive Gum
>>
TMQ850 Automatic Die Cutter Paper cup sleeve punching machine foil cutting equipment
>>
Industrial Mini Organic Poultry Feather Meal Processing Rendering Plant
>>
Qt10-15 Hydraulic Paver Block Making Machine Hydraulic Fully Automatic Block Production Line
>>
Leather Metal Belt Edge Grinding Polishing Machine Belt Grinders
>>
Nongbole Electric Corn Sheller Machine and Hot Sale
>>
Ecas-S400 Electronic AC Motor Table Typed Place Working Tractor Cherry Picker Harvester Loader
>>
High Quality Senmu Tech 12.8CM 153 Wheel Hub Bolt for Car
>>
Pinion Planetary Gear Engineering Machinery Parts-002
>>
Plastic Polypropylene Pp Sheet
>>
4pcs Car Door Handle Pocket Storage Box Organizer Container Holder Box for Tesla Model 3 Y 2017-2021 Interior Accessories
>>
Premix Feed Ms-Layer Improver Feed Additives
>>
Professional Manufacturer Hardwood Flooring Oak Waterproof Quartz Parquet Click Herringbone 8mm 10mm 12mm Laminate Flooring for Indoor