US$15,000.00-40,000.00
|
1 Set
(MOQ)
|
Basic Info.
Certification
CE, RoHS, ISO 9001:2000, ISO 9001:2008
Drill Hole Diameter
115-150mm
Wind Pressure
1.2-2.46MPa
Air Consumption
10-20m3/Min
Rotation Speed Distance
0-126/Min
Chassis Ground Clearance
300mm
Travelling Speed
0-2.5km/H
Transport Package
Standard Export Package
Origin
Zhengzhou City, China
Production Capacity
30sets/Month
Packaging & Delivery
Package Size
3600.00cm * 1300.00cm * 1700.00cm
Package Gross Weight
3600.000kg
Product Description
Product Parameters
Wind pressure(Mpa) | 1.2-2.46 |
Air consumption(m³/min) | 10--20 |
Drilling diameter(mm) | 115---150 |
Drilling depth(m) | down 62m |
Once promotion distance(mm) | 3000 |
Drill diameter(mm) | 76 |
Skid compensation(mm) | 1200 |
Maximum lift force(N) | 26000 |
Guide shell pitch (°) | up and down total 100 |
Guide shell swing angle(°) | Left and right total 100 |
Boom lift angle(°) | up and down total 70 |
Boom swing angle(°) | 70 |
Grade ability(°) | 30 |
Chassis ground clearance(mm) | 300 |
Travelling speed(Km/h) | 0-2.5 |
Back to the transit speed(r/min) | 0--90 |
Rotary torque(N.m) | 3200 |
Host Power(kw) | 56 |
FAQ 1. Are you a trading company or a manufacturer?
We are a professional manufacturer. Our factory mainly produces water well drilling rigs, core drilling rigs, down-the-hole drilling rigs, pile drivers, etc. The products have been exported to hundreds of countries around the world and enjoy a high reputation all over the world.
2. How is the quality of your machine?
Our products pass strict quality inspections before they leave the factory to ensure that they are qualified before they are shipped.
3. How to inspect the goods?
1) Support customers to come to the factory for on-site inspection.
2) Support customers to designate third-party companies to inspect goods.
3) Support video inspection.
4. Do you have after-sales service?
Yes, we have a dedicated service team that will provide you with professional technical guidance. If you need, we can send our engineers to your workplace and provide training for your employees.
5. How about quality assurance?
We provide a one-year quality guarantee for the main machine of the machine.
6. How long is your delivery cycle?
1) In the case of stock, we can deliver the machine within 7 days.
2) Under standard production, we can deliver the machine within 15-20 days.
3) In the case of customization, we can deliver the machine within 20-25 days.
>>
Brake Hose An4 6An StainlessFitting Push In Swiveling Plumbing Adapters Pipe Fitting
>>
Underbody Exterior ambient Lighting dream color waterproof rgbic ws2811 Car Underglow Lights Remote Control
>>
Factory Disposable Medical Waterproof Underpads for Adult Puppy Dog Cat Patient
>>
factory price canned catfish processing line
>>
Customize Cheap Cotton Men Hoodie
>>
Multiwall Belt Making Machine.
>>
Escalator Moving Walk Group Wheel Parts Roller Chain
>>
Wireless Glove integrity tester WGT-1000
>>
Automatic Rhinestone Hotfix Machines
>>
Atc CNC Oscillating Knife Leather Cardboard Carton Cutting Cutter Router Machine for Wood MDF PVC Acrylic
>>
Book Binding Adhesive
>>
Youth Football Shoulder Pads All-Round Protectors
>>
20L Commercial Grade Stainless Steel Percolator Coffee Maker Hot Water Boiler Urn for Catering
>>
New Original SICK DFS60B-S4AA05000 1037124 Encoder
>>
4D Moisture-Wicking Breathable Foam Insoles with Arch Support
>>
Lugong Internal Combustion Drive Home Thumbs Mini Excavator Lz17 Prices
>>
2025year New Look Slub and DOT Yarn Made Linen Looks Curtain Fabric
>>
18mm X 25mm Black Plastic Cable Wire Carrier for Lathe Machine
>>
Scented Green Black Tea Herbs Crush Leaves Powder Processing Dryer Microwave Drying Sterilizing Machine
>>
Inflatable Neck support pillow /cervical neck traction device /air neck traction collar cervical