|
US$155.00-221.00
|
1 Piece
(MOQ)
|
Basic Info.
Model1
Ba-E1004,Ba-E1104,Ba-E1204
Model2
Ba-E2004,Ba-E2104,Ba-E2204
Transport Package
High-Quality Cartons/Crates
Production Capacity
200units/Month
Product Description
Infitek 0.0001g/100g~220g Analytical Balance High Precision Balance Features External calibration Electromagnetic force sensor LCD(White back light with black font) Tare function/Counting/Unit conversion Sensitivity/Speed set/Percentage Accumulation function/peak hold Overload alarm/Fault alarm/Level indicator Option:printer Specifications
Model
| BA-E1004 | BA-E1104 | BA-E1204 | BA-E2004 | BA-E2104 | BA-E2204 |
Capacity(g)
| 100g
| 110g
| 120g
| 200g
| 210g
| 220g
|
Resolution(g)
| 0.0001g
|
Min weighing(g)
| 0.0004g
|
Stable Time
| ≤3s
|
Display
| LCD(white back light with black font)
|
Pan size
| Φ80mm(Standard),Φ90mm(Optional)
|
Operation temp
| 5-35ºC
|
Repeat ability
| ±0.0002g
|
Liner
| ±0.0003g
|
Dimension
| 300X200X295mm
|
Draft shield size
| 180x175x200mm
|
LCD Size
| 96x24mm
|
Cal.weight
| External Calibration
|
Option
| RS232C(Standard)/Printer(Optional)
|
Packing size
| 425x320x415mm
|
G . weight
| 8.0kg
|
Packaging & Shipping
Certifications
About Us
FAQ Q: How about quality of the goods?
A:
All the running products comply with CE standards.
Independent quality inspection team, conducting multiple inspections and random inspections from parts supply to product dispatch.
Well-known third-party testing service available, such as SGS, BV, and TUV, etc.
Q: What are your pre- and after-sales services?
A:
Timely reply to pre-sales enquiries
Real-time update of manufacturing and shipment status
Contracted third-party maintenance company in over 60 countries
Assured availability of parts supply for 10 years at least
Q: Is OEM service available.
A: Most of the running products are available for OEM customization, including logo, package and function, if attainable, customization.
Q: How long is the lead time:
A: Generally, the lead time for most stocked products is about 7~15 days, vary by models and production schedule. For those non-stocked products, the manufacturing lead time is around 20 days.
>>
Silk Sleep Eye Mask Padded Shade Cover Travel Relax Aid Blindfold
>>
Remote Control Outdoor Sunshade Motorized Rolling Vertical Blinds
>>
High Surface Hardness and Wear Resistance PCD Profile Cutters Tools for Click Slotting Machine
>>
Acetal engineering plastic pom rod/bar
>>
Home Appliances 100/400/600gpd 5 Stage Home Use RO Water Purifier with TDS Display Reverse Osmosis System Water Filter Water Treatment Equipment
>>
Hanging Nutshell Footrest Navy Blue Unique Hammock
>>
Hand Operated Hoists with Good Material
>>
Sports Toy Magnetic Dart Board Shooting Target Game Toy
>>
Longer-Service-Life Acid-Resistant Z457/U457/U718 U500/U606 Retaining-Walls Vinyl Plastic PVC Sheet Pile
>>
Cement Consistency Setting Time Tester Full Automatic Vicat Apparatus
>>
Camo Multifunctional Foldable Tool Bag with Internal Pockets for Storing Hand Tool
>>
1 OZ 1.5OZ Wine Whisky Bottle Stainless Steel Hip Flasks Polished Round Bottom Portable Wine Bottle Tubular Pot Accessories
>>
Titanium Electrode Medical Ozone Sterilizer Therapy Home
>>
Commercial Industrial Tilting Candy Sugar Nut Chocolate Coating Polishing Pan Machine
>>
6 HP Danfoss refrigeration cabinet piston compressors MTZ72HN4AVE
>>
Fully Automatic Mechanical Men's Watch Waterproof Leisure Outdoor Multifunction Calendar Man's Wristwatch
>>
Superfine Mining Ball Mill/Rod Mill for Copper/Gold Ore
>>
Lab Small Model Rubber Mixer Kneader for Testing
>>
Automatic High Speed Single Facer Corrugated Machine with Steam Heating
>>
New Design Classic Makeup Bag Houndstooth Pattern Cosmetic Bag with PU Cover for Lady and Girls Fashion Tote Travel Storage Bag