|
US$10,000.00-400,000.00
|
1 Set
(MOQ)
|
Basic Info.
Plastic Type
Thermoplastic, Tube Head Injection
Plasticizing Way
Screw Type
Clamping Way
Hydraulic & Mechanical
Computerized
Computerized
Certification
CE, ISO9001:2008
Distance Between Tie Bars(Width)(mm)
410 mm
Screw Speed (Rpm)
0 - 400 Rpm, 400
Injection Weight (PS)
124,148,175g
Theoretical Shot Volume(Cm3)
163 Cm3
Injection Rate (G/S)
265 G/S
Distance Between Tie Bars
410*370
Screw L/D Ratio
21, 23,21,19.3
Screw Diameter
32,35,38 mm
Mold Height(mm)
150 - 380 mm
Shot Volume (Theoretical)
136,163,192 Cm3
Production Capacity
500 Set/Sets Per Year
Product Description
D/120 Hybrid Servo Vertical Injection Molding Production Line
Product Description
Specification
Machine weight
| D/120
|
Screw type
| A
| B
| C
|
Screw diameter (mm)
| 32
| 35
| 38
|
Screw L/D ratio (L/D)
| 23
| 21
| 19.3
|
Shot volume (theoretical) (CM3)
| 136
| 163
| 192
|
Injection weight (PS)(g)
| 124
| 148
| 175
|
Pump max.pressure (Mpa)
| 16
|
Pump motor power (servo)(KW)
| 57.5
|
Number of heating area(Segment)
| 3+1
|
Machine dimension (L*W*H) (M)
| 4.9*1.32*1.95
|
Production Process
1. What kind of plastic material can be used on this machine?
PP, PE, PS, ABS and other general material could be used on this machine.
If you have other special material such as PC, PMMA, PVC, please contact us for further information. 2. What is guarantee time for this machine?
12 months after installation or 18 months again B/L date.
3. What kind of shipping container for this machine?
Containere choose will depends on the different machine size . 20HQ,40HQ,40GP will suitable for different size machine.
4. How much is Engineer service charge?
We can send experienced technician to customer's country for guiding the installation and commission the machine, also train the
customer's employee. Customer need to afford technician visa charge, round trip air ticket expense, accommodation and
transportation in local. Also customer needs to pay USD 80 per days to technician as salary.
5. How long will be for installation and commission this machine?
If customer prepare all necessary thing such as power supply, water supply, hydraulic oil, plastic material, plastic mold,
installation and commission period will be within 7days including training customer's employee.
6. How many workers are needed to operate this machine?
One worker only.
7. What is the power consumption for this machine?
Power consumption is determined by the product. Different product requests different power consumption.
>>
Artificial measurement balloon packaging machine balloon packaging machinery
>>
brazil pistachio nuts bio pistachio etc seeds
>>
2023 Hot Selling Hanger Bolt Fastener
>>
Xb-12 Commercial Gym Fitness Equipment Magnetic Resistance Indoor Spinning Bike
>>
OEM Home And Office Use Inverter 6000BTU 0.5Ton Floor Standing Air Conditioner
>>
Sk3360, P550747, Fs19551, Wk10602, H704wk, 1518512, Fuel/Oil/Lube Filter for Scania (1518512)
>>
Complete 1t/H Wood Pellet Production Machine Cost
>>
Precipitated Barium Sulfate 325 Mesh for Coating
>>
Timing Guide for Ford F-150 5.0L OEM FR3Z6K255B JL3Z6K255A Guide Rail TR1630
>>
Wholesale Price Badminton Products Professional Badminton Nets
>>
Handheld 800m Scope Mount Hunting High Precision Rangefinder binoculars Good Quality Lens Distance Meter Laser Range Finder
>>
kitchen waste bins on the table trash and recycling corrugated waste bins
>>
Tc1065 High Precision 5 Axis CNC Machine in Stock CNC Gantry and Machining Machine Price
>>
Car Accessories Tail lamp tail lights for Nissan navara
>>
CNC Pipe Profile Flame Cutting Workstation Manufacturer with Promising Quality and Durability
>>
Aspor A323 Factory Price 10000mAh Portable Power Bank Ultra-Thin Power Station 10000mAh Slim Powerbank
>>
Fully Automatic Peanut Picker Machine
>>
Fase Speed Injection Molding Machine for 5-25L Barrel
>>
2kw 3kw 6kw Fiber Automatic Laser Welder CNC Welding Machine for Metal Stainless Steel Aluminum Hardware with Good Price
>>
8X8 Inch One Compartment Hinged Clamshell Disposable Bagasse Food Container