Product Details
Product Description
Product Description
Harmless Treatment Equipment
1. Conduct surface treatment of the diseased livestock carcasses in the wetting preparation room. Treatment methods include: pool soaking or ultraviolet rays, etc. Divide the common diseased livestock carcasses, and then prepare for wetting. For the carcasses of livestock with major epidemic diseases, do not divide them, but prepare the whole for wetting.
2. Use the transport vehicle to transport the diseased livestock carcasses or carcass pieces that are ready for wetting into the wetting machine, close the machine door, and at the same time close the manual interlock, and inject 0.3Mpa compressed air into the machine door sealing ring to seal the wetting machine. Then, check whether all the valves of the wetting machine are completely closed. After checking and confirming that there is no error, turn on the power supply of the distribution box, set the wetting temperature through the temperature controller (generally around 150°C), and then inject steam into the wetting machine. At the same time, open the exhaust valve. About 3 minutes later, the cold air in the machine is discharged. Close the exhaust valve for wetting. Under the high pressure of 0.55Mpa and the high temperature of 150°C, after a period of time, the wetting is completed (the wetting time should be adjusted by the operator according to the size and quantity of the treated materials in the machine). At this time, it is necessary to first open the silencer valve of the deodorizer, and then open the exhaust valve of the wetting machine to relieve the pressure. When the pressure is released to below 0.02Mpa, close the exhaust valve and stop the pressure relief.
3. Gradually open the valve between the wetting machine and the oil-water separator, and put the oil-water mixture after wetting into the oil-water separator, and then close the valve and let the oil-water mixture stand for more than 1 hour. Open the exhaust valve of the wetting machine again to release the pressure in the wetting machine completely. Then, open the manual safety interlock, open the machine door, and transport the residue after wetting out.
4. One hour after the wetting is completed, open the water drain valve of the oil-water separator to discharge the wastewater. When the oil-water boundary line is 1cm lower than the oil drain port, close the water drain valve.
5. Open the oil drain valve of the oil-water separator, and let the separated oil flow into the container for storage and sale.
After-sales Service
1. Production Cycle
Generally, it takes 10 - 40 working days, which is determined by the model and quantity of the products ordered by the customer.
2. About the Model
Customers can choose the model that suits them according to the category and output of the materials to be processed.
3. About the Material
There are currently two types: carbon steel and stainless steel. Stainless steel is further divided into two grades: 304 and 316.
4. About Customer Service
One-to-one service. After the equipment is purchased, a dedicated technician will come to the site to guide the installation and commissioning, and train 1 - 2 operators.
5. About After-sales
One-year warranty and lifetime maintenance.
6. About Delivery
Transported by truck, wrapped with plastic film. It generally takes 3 - 7 days depending on the distance.
>>
Backrest Chair Household Plastic Thickened Large Stackable Creative Chair
>>
Bow Roll After Size Press
>>
Fast heating 400w infrared heaters portable electric infrared heaters
>>
HONEYWELL SPS5785 51198651-100
>>
Hzmed Tianji Regenerate Ossein Injectable Dermal Filler, Is Used for That Promotes Tissue Regeneration, Restore Youthful Facial Contour.
>>
Concrete Ground Epoxy Floor Grinding Machine with Vacuum Cleaner
>>
MAICTOP auto led halogen & xenon headlights for lexu RX LS GX IS NX ES GS LX RX350 LX570 CT200 LS460 IS250
>>
Shanxi Shacman truck brake camshaft HD91129340007
>>
Industrial Socks Machine for Toe Linking
>>
high quality car accessories the bodykit body kit sets the front bumper TRD grille for TOYOTA LANDCRUISER PRADO FJ150 2018
>>
KF1,KF2,KF3,KF4,KF5,KF6,KF9,KF12,KF19,KF22,KF35,KF45,KF27,KF70 F9 F19 F35 F45 Furukawa hydraulic breaker kent rock hammer diaphragms chisel seal kits
>>
Carbon Dioxide Removal Membrane
>>
Bicycle Abnormity Handlebars Show Bike Handlebars Children′s Bicycle Handlebars
>>
Good Quality 5L Two Cavity Automatic Pet Plastic Jar Bottle Making Machine
>>
High Quality Best Selling Water Proof Lining Material Genuine Leather Toiletry Bag from Trusted Indian Exporter
>>
Hydraulic Automatic Nc Press Brake Machine, Intelligent E21 System Bending Machinery
>>
Circular Knitting Machine for Tools Series, Dust Blowing Air Gun, Ccqq-01
>>
Wrought iron roses elegantly metal decorate for outdoor garden fence
>>
Cold Rolled AISI Colourful Ss Plate316L Stainless Steel Sheet with Factory Price
>>
Injection Moulding Machine 350 Ton Injection Moulding Machine 80ton Injection Moulding Machine Hi Tech