Product Description
Product Description
Product Description
1. BTE Number: 571260/371260
2. Ref. Number:
| Ref. No. | VKBA6851 |
| Ref. No. | 713 6188 30 |
| Ref. No. | R169.65 |
| Ref. No. | 512329 |
| Ref. No. | RW8329 |
| Ref. No. | DACF2126PR |
| Ref. No. | 42450-32040 |
| Ref. No. | 42450-32041 |
| Ref. No. | 42450-63011 |
| Ref. No. | HA590040 |
Packaging & Shipping
1. NEUTRAL package.
2. BTE Box + Carton + Sea Worthy Pallet
3. Customerization packing
Our Services
1. Sample: free sample for the customers to test our quality.
2. Guaranty: 20,000 kilometers or 1 years after the shipment
3. logo: free laser marking of your logo
4. Package: Natural packing or Customerization packing
Company Information
1.Managemant System: ISO9001.
2.Delivery: 45 days after receiving prepayment.
3.Guaranty: 60,000 kilometers or 2 years after the shipment.
4.Design and Development: 45-60 days for new items aganist the sample.
5.Exhibition: Frankfurt exhibition in Shanghai each year,China Construction machinery exhibition and 3-5 for the oversee exhibition for Auto parts.
6. Market: European,South American and Asian.
FAQ
1. Q: What's about your brand and package?
R:We can offer two different business solution: A, BTE brand, BTE code and BTE packing; B, customer’s brand, code and packing. For the customer’s packing, we have to ask for the reasonable quantity and charge the additional costs.
2. Q: Which kind of the bearing do you used in your tensioner?
R: Most of our tensioner are used the Chinese bearings. We can also use the Japanese bearing, however the costs of the bearings are very expensive. We suggest you to use the Chinese bearings, all these bearings are well controlled for the auto application. The grease is ESSO N3 or, Korean grease TP3200.
3. Q: The delivery time of our new order
R: The general delivery time is about 45 to 65 days after the order confirmation. This delivery date is the on board time in China, not the arrival time. We are also trying to supply our customers from our stocks. Most of our stocks are the spare part, we are not able to give an exact stock list. We need to check the delivery date according to the quantity and our production plan.
4. Q: What's about your payment item?
R: The payment term is L/C sight or T/T in advance. The normal term is TT 50% against the order and TT 50% before the shipment date.
>>
New Construction Mining Building Used Horizontal Shaft Sand Making Machine Fine Impact Crusher Price
>>
Wholesale Waterproof Foldable Outdoor Camping Mat Extra Large Beach Mat
>>
High quality wholesale Equinox car Lower skin of front bumper For Chevrolet 84554614
>>
Recorder and player, TV image, sound recording
>>
Vuexe Heavy-Duty High-Efficiency Air Filter P623400 Af4222 2517298c1 P616050 for International Integrated Coach
>>
Custom Classic Promotion Cotton Fashion Men′s Round Neck Tee T Shirt
>>
SA0120 Good quality Female IUD placing and removing set medical surgical instruments set
>>
Custom Made Stamping Black Metal Support Bracket
>>
Full Mesh Adjustable Comfortable Ergonomic Massage Office Chair
>>
Modern Popular Bathroom Faucet Brass Birdbath Faucet
>>
Adhesive Brushed Anti Dew Sheet Boat Flooring Carpet EVA Synthetic Marine Foam Flooring
>>
China Door to Door Freight Forwarder to Europe Fast Shipping by Railway Shipping
>>
ceiling integrated nail, integrated drive pin, decoration integrated ceiling nail, fire-fighting nail with complete specifications.
>>
label die cutting press Automatic Label Die Cutter Flat Bed Adhesive Label Die Cutting Machine
>>
Mine screen filter cylinder wedge-shaped wire-wound sieve cylinder pig manure dewatering machine screen
>>
Good Quality Bottle Wine Cap Mould
>>
Groove V Machine Metal Sheet Plate Grooving Machine Ss
>>
Fully Automatic C Z Purlin Cold Roll Forming Machine for CZ Channel Steel Build Framing Material
>>
Pet/RPET/PLA Nonwoven Fabric Production Line Nonwoven Fabric Machine for Packaging Filtration Material
>>
IRFPG50PBF Vishay Semiconductors MOSFET 1000V N-CH HEXFET