Basic Info.
Application
Metal Recycling Machine, Metal Cutting Machine, Metal Straightening Machinery, Metal Spinning Machinery, Metal Processing Machinery Parts, Metal forging Machinery, Metal Engraving Machinery, Metal Drawing Machinery, Metal Coating Machinery, Metal Casting Machinery
Use for
Electrical Contact
Transport Package
Plastic Bag,Carton, or as Per Customer Requirement
Production Capacity
100000pieces/Year
Packaging & Delivery
Package Size
30.00cm * 20.00cm * 10.00cm
Package Gross Weight
5.000kg
Product Description
Product Description
| Product Name | Metal Processing Machinery Parts CNC Service |
| Product Dimension | Various shapes are available |
| Product Shape | Various shapes are available |
| Processing Type | Stamping |
| Tolerance | ±0.02mm or as per customers' requirement. |
| Material Standard: | ISO, DIN, ASTM, UNS, AISI, JIS, BS, NF |
| Materials available | Stainless Steel, Carbon Steel, Steel, Copper, Brass, Aluminum, Silver, Gold, Chrome, Tin, Nickel, Zinc, Alloy etc. are available. |
| Material Thickness | As per customers' requirement. |
| Surface Treatment/Finish | Anodize, Chromate, Electrolytic Plating, Nickel Plating, Galvanize, Tempered, Paint, Powder Coating, Polish etc., |
| Heat treatment capability | Annealing, Normalizing , Nitriding, Tempering ,Carbonitriding, Carburizing and induction hardening etc., |
| Industry Of Use | Electrical |
| Quality Assurance | GB/T19001-2016 ISO 9001:2015, GB/T240001-2016 ISO 14001:2015, RoHS |
| Sample Lead-time | Within 1day for samples available from our stock About 1-2weeks for custom samples |
| Mass Production Lead-time | 3-7 weeks after receiving deposit. |
| Price Terms: | EXW/FOB/CFR/CIF SHENZHAN or any other airport or seaport, China |
| Payment Terms | 30% deposit, balance against B/L copy |
| Modification | Mould modification until the customers satisfy it. |
| Inspection | In-house or third party, all the products are strictly inspected by skilled QC |
| Design: | We use the most advanced mould design software Auto CAD, Pro/E, Solidworks, UG (dwg, dxf, IGS, STP, X-T) |
| Country of Origin | China (mainland) |
| Main Export Markets | Europe, America, Mid East, Asia, Africa etc., |
| Service Type: | OEM & ODM |
| Business Type: | Manufacturer, Exportor |
| Advantages | Expert in producing OEM parts: metal stamped, machined, deep drawn and sheet metal formed parts with various finishing Our factory is located in Dongguan, nearby Guangzhou and Shenzhen ports, which can save transportation time and cost Employing reliable rockers and utilizing advanced machines: we have a full range of machinery and equipment for punching, welding, CNC, milling and grinding. We also have experienced technicist who are engaged in technical development. Our skilled workers, professional engineers, R and D center and excellent foreign trade team always keep the passion to support our customers |
We are specialized in the design and fabrication of plastic injection mould, die casting mould, rubber mould. We provide the mass production service for the parts and offer different prices per your varied volume of production demand. Please kindly send us your request.
1. Automotive Sector2. Powered Tools Industry3. Home Appliance4. Medical Industry5. New Energy Application
Tooling Specifications and Requirement
| Tool Life Cycles | Extremely High Volume | High Volume | Low Volume |
| 2D Design Drawings | | | |
| 3D Design Drawings | | | |
| Component ID | | | |
| Tool Steel ID | | | |
| Cycle Counter | | | |
| Spare Ware Parts | | | |
| Spare Parts List | | | |
| Fully Automatic Operation | | | |
| DFM Report | Shall be completed and approved before mold build. All part model changes shall be approved. Report include: KO locations, gate locations, parting line, split lines, mold flow analysis (when required), cosmetic issues, dimensional issues. |
| Cpk Requirement | Required Cpk requirement for critical dimensions. |
| Cycle Time Target | Mold cycle time shall meet or exceed targets while producing parts within the Cpk requirements. |
| Critical Dimensions | Percentage of print tolerance to nominal, mold cavity dimensions of critical dimensions shall be held within. |
| Minor Dimensions | Percentage of print tolerance to nominal, mold cavity dimensions of critical dimensions shall be held within. |
| Self Lubricating Hardware | Hardware that sees movement should be self lubricating per hardware requirements. |
| Certified Tool Steel | Tool steel shall be certified from steel provider. |
| Mold Flow Analysis | (when required) |
| Mold Dimensional Study | |
| Part Dimensional Study | |
Inquiry basic information: Part 2D dwg, 3D file, or sample picture with measurement (3D in IGS, stp format, etc):Tooling steel:Standard mold base or not:Runner system (Cold or Hot):Mold cavity: multi-cavity tool, shut-off gating design for each cavity.Delivery address: The Strength of SUN HUA: 1. Die casting tool expertise.2. Integrated solution service for die-casting parts, plastic injection parts and toolings.3. Time and cost effective4. Project management and Efficient delivery.
Tooling Making
Company Profile
Strength:
1. We are a die caster specialized in OEM die casting parts production from model designing,prototype build, tooling build and mass production since its founding from 1997. 2. Top brand customer cooperation, such as BOSCH, TTI, and BYD etc.
3. Equipment includes CNC, EDM, grinding machine, die casting machine (from 88 ton to 2500 ton).
4. Dedicated and integrated solutions for your products with the best price. Expertised Tooling Making 6. As-cast Quality Control 7. Precision CNC machining 8. Measurement Correlation 9. Production Planning and Management 10. Project Management and Scheduled Delivery 11. Providing good after-sale service, if the products have any quality issues.
Qualification and Honor
FAQ
Q1. Are you a factory or trade company?
We are a factory located in No. 86-88, Hongying Industrial Zone, Hongshi Bridge, Fenggang Town, Dongguan City,
Guangdong Province, China
Q2. What kind of production service do you provide?
Mold making, die casting, CNC machining, stamping, plastic injection, assembly, and surface treatment.
Q3. How about the lead time?
Mold: 3-5 weeks
Mass production: 3-4 weeks
Q4. How about your quality?
♦We have got ISO9001:2015 and IATF16949:2016 certificates.
♦We will make the operation instruction once the sample is approved.
♦We will 100% inspect the products before shipment.
Q5. How long should we take for a quotation?
After receiving detailed information(your 2D/3D drawings or samples), we will quote you within 2 days.
Q6. What is your quotation element?
Drawings or Sample, Material, Finish, and Quantity.
Q7. What is your payment term?
Mold: 50% prepaid, balance after sample approval.
Goods: 50% prepaid, balance T/T before shipment.
>>
ABS thin sheet production line
>>
Acm Ultra-Fine Air Classifying Mill with Complete Accessories
>>
3 Strand Super Danline Polypropylene/PP/PE Rope Yellow Color
>>
Punching Machine Deep Hole Metal CNC Drilling Machine
>>
Hotsale Tungsten Carbide Spray Nozzles From China
>>
Best Price Custom Made Carbon Steel Fuel Tank
>>
Wholesale Price Outdoor Portable Lightweight Folding Fishing Stool Retractable Plastic Camping Stool
>>
FSC CERTIFICATE BCI COTTON 32/1, 50% Cotton 50%Bamboo Blended Yarn
>>
High-Efficiency Waste Plastic Recycling Machine for HDPE LDPE Films
>>
Pallet Roll-in Low Profile Lift Table
>>
Dm-300 Top-Down DLP 3D Printer High Accuracy & Speed for Industrial Grade Resin Printing
>>
Mdi Polyol Vessel Stainless Steel Mechanical Seal Pressure Vessel
>>
Ekintop Professional Comfortable Barber Shop Swivel Retro Black Barber Chair
>>
20000 Water Tank Truck Water Storage Tank For Trucks Brand Of Water Tank Truck
>>
Odor Control Rinse Tofu Cat Litter Wholesale Inventory
>>
Basis Fashion Style PC Sunglasses for Adult
>>
BOPP Film for Food Packaging Making Bags
>>
Chicken Duck Goose Rabbit Poultry Feed Pelletizer for Small Feed Production Line
>>
Bobbin Hanger Various Type for Spinning Machinery Parts Textile
>>
Era Plastic UPVC Ball Valve Pn10 Pn16 with NSF-Pw & Upc Certificate