Welcome to visit

Lone Life Energy Saving Aquarium Metal Halide Bulb

US$20.00 100 Pieces (MOQ)

Basic Info.

Model NO.
(175W/250W/400W/1000W E40
Power
175
Bulb Type
T
Base Type
E39
Rated Avg. Life
6000hrs
With Light Source
With Light Source
Energy Saving Aquarium Metal Halide
(175W/250W/400W/1000W E40
Transport Package
100PCS/Carton
Specification
CE ISO SGS
Trademark
dingming
Origin
China
HS Code
85393290
Production Capacity
10000PCS/ Month

Packaging & Delivery

Package Size
10.00cm * 10.00cm * 50.00cm
Package Gross Weight
3.000kg

Product Description

Product Description
Aquarium metal halide lamp: High color temperature, 10000k, 15000k, 20000k. Single ended E40 base 175W, 250W, 400W, 1000W. Double ended R7S, FC2 base, 70W, 150W, 250W.
W Bulb Base v lm MOL LCL Hours k CRI
175 T46 E40 220 7500 255 149 6000 10000 80
175 T46 E40 220 7500 255 149 6000 15000 80
175 T46 E40 220 4300 255 149 6000 20000 80
250 T46 E40 220 11000 255 149 8000 10000 80
250 T46 E40 220 11000 255 149 8000 15000 80
250 T46 E40 220 5000 255 149 8000 20000 80
400 T46 E40 220 18500 286 170 8000 10000 80
400 T46 E40 220 18000 286 170 8000 15000 80
400 T46 E40 220 8000 286 170 8000 20000 80
1000 T76 E40 220 50000 340 233 3000 10000 80
1000 T76 E40 220 / 340 233 3000 15000 80
1000 T76 E40 220 / 340 233 3000 20000 /
Packaging & Shipping
White box or as required
There is 25pcs in one carton.
Carton size is 58*34*30CM.
The GW/carton is 10KG.
FAQ Q:Are you a factory or trading company?
A:We are professional manufacturer established in 1996 for the purpose of providing top quality special halogen lamp application. Q:What's your product scope?
A:Stage halogen lamp/Infrared heat lamp/Locomotive lamp/Aircraft lamp/Marine lamp/Instrument lamp/Metal halide lamp/LED lamp. Q:If I want to buy a lamp,what parameters need to be provided?
A:Voltage,Wattage,Overall length,Optical center,Tube diameters,Base,Quantity. Q:What's your payment term?
A:We accept T/T,L/C,Western Union. Q:How does your factory do regarding quality control?
A:Quality is priority.Our factory do 100% inspection at each production procedure,and we do 2 rounds lighting test during production,and the 3rd test before packing. Q:How do you ship the goods and how long does it take to arrive?
A:We usually ship by DHL,UPS,FEDEX,EMS or TNT.It usually takes 3-5 days to arrive.Airline and sea shipping is optional.
>> Pre-Painted Galvanized Iron Sheet 0.3mm 0.4mm 0.45mm 0.5mm Thick Color Corrugated Roofing Sheet
>> Factory Supply Wear Plate Cutting Rings S Valve Tube Plunger Cylinder Delivery Cylinder Wear Sleeve Concrete Machinery Concrete Pump Parts
>> Small Weight Waterproofing HDPE Pond Liner Plastic Welders HDPE Geomembrane Hot Wedge Welding Machine Saldatrice per Geomembrane
>> China Made Factory Price Cylinder Head Metal Surface Grinding Machine Profile Grinding Machine
>> Laboratory Wool Fancy Spinning Machine with 6 Spindles
>> Drinking Water Stainless Steel Nipples/ Pigs Drinking Water Nipples
>> 100m Length Spray Hose Customized High Pressure Spray Hose 8.5mm Hose
>> promotional factory natural dry paper skin walnuts ceviz akhrot for wholesale
>> In Stock Automatic Bacon Wrapping Machine Sliced meat Flow Packaging Machine
>> S19 GPU Gtx 1660ti 3080 Gaming Card 6GB 1660s GPU Card
>> 3.5X-90X Stereo Zoom Microscope 14MP HDMI Camera Phone Repair
>> Automatic Bottle Water Filling Machine with Customer Desigened Service
>> Chinese Manufacturer High Automation Leveling Feeder for Auto Car Parts Stamping
>> Taijia TEM-912 Digital Sclerometer schmidt hammer Concrete Test Hammer Rebound Test hammer Esclerometro
>> 5gallon Food Grade 750g Pet Preform for 18.9L Water Bottle
>> 240 Ton Horizontal Plastic Injection Molding Heat Processing Machine with Servo Motor
>> Sg3060r Semi Automatic Hydraulic Precision Surface Grinder Machine
>> Kitchen Sponge Holder for Rag Brush Soap with Drain Tray Stainless Steel Sink Caddy Sponge Holder for Kitchen Countertop
>> Rollator Walker Lightweight Aduminum Adult Singe Button Folding Walker
>> Taijia rebar detector tem-620xh industrial metal detectors concrete scanner rebar Detect the position of rebar