US$3,999.00-14,999.00
|
1 Set
(MOQ)
|
Basic Info.
Automatic Grade
Automatic
Voltage
According to Customer′s Request
Transport Package
in Wooden Case Safety Packing
Specification
ISO9001, SGS, CE
Production Capacity
400sets/Month
Product Description
XJ-150 hot feeding rubber extrusion machine /cold feeding extruder machine
1. SGS, ISO9001: 2008, CE certification3. Low noise, high safety and convenient5. Competitive price6. Customizable7. Delivery within 30 days.8. Sell to 126 countries on 6 continents.Rubber Extruder Machine with Frequency Converter
Basic introduction Of XJD-65/115/120/150/200 Hot Feed Rubber Tread Extruder /Cold Feeding Extruder Machine
XJD-65/115/120/150/200 Hot Feed Rubber Tread Extruder /Cold Feeding Extruder Machine is used to extrude tread, inner tube, hose, and a variety of rubber type strips of rubber machinery, and also for covering the cable and wire products. Common-screw extruder, plastic material with the rotation of the extruder screw it at work, mixing in a drum machine, mixed plastics and pressed, and then move to the carriage direction, and finally squeezed from the mouth a certain shape of the product.
2.XJD-65/115/120/150/200 Hot Feed Rubber Tread Extruder /Cold Feeding Extruder Machine is one of the basic equipment for the rubber industry, is one of the key equipment of the impact on product quality plays a very important role in the production process of the tire and rubber products. The development experience of the foreign rubber extruder piston extruder, screw-type heat feed extruder, the common cold feed extruder, main and auxiliary threads cold feed extruder, cold feed exhaust squeeze machine, pin cold feed extruders, compounding extruder stage.
Product Features:
1. Durable machine body with sufficient raw material applied.
2. Reliable machine quality with superior accessories chosen.
3. Latest machine design
4. Less maintenance needed
5. Easy installation
6. Environment protection
7. High safety configuration
8. High automation
9. High efficient and superior mixing performance.
10. Low power consumption & labor saving.
. Technical Parameters:
Type and spec. | XJ-65 | XJ-85 | XJ-115 | XJ-150 | XJ-200 | XJ-250 |
Screw dia.(mm) | 65 | 85 | 115 | 150 | 200 | 250 |
L/D | 4 | 4.8 | 4.8 | 4.4 | 4.4 | 4.5 |
Screw rotational speed(r/min) | 20.27 35.47 | 27.40 53.72 | 20~60 | 27~81 | 22.4~67.2 | 19.7~59.1 |
Motor power(kw) | 7.5 | 17 | 30 | 15.3~55 | 33.3~100 | 33.3~100 |
Overall dimension L×W×H(mm) | 1600×675×1053 | 2050×735×1275 | 2770×665×1300 | 3585×814×1470 | 4549×1140×1750 | 4950×1150×1483 |
Capacity (kg/h) | 50~80 | 62~270 | 100~350 | 800 | 1500~2200 | 3500 |
Total weight(t) | 1.5 | 2.6 | 3.3 | 4.5 | 7.21 | 9 |
FQA-Problems for customer concern:
About machine performance quality
1. Q: How to guarantee the quality of outsourcing parts? A: First choice more than 4 suppler by tender, There are strict system and process for inspecting outsourcing parts. And there are outsourcing inspectors, after inspection, qualified goods, labeling and storage. Not qualified, return.2. Q: Which brand of electric part? A: Use world famous brands, Siemens, Omron, Toshiba, Schneider, ABB Customer can specify the brand.3. Q: Which PLC: A: Siemens, Omron, Mitsubishi4. Q: How to control the quality? A: There are inspectors for inspecting equipment quality and performance, after a ssembly, machine run continuously for at least 12 hours at one time, Total running time should be not less than 48 hours.
About installation 1. Q: When the guide engineer arrive at customer's factory? A: If need installation on site, engineer will arrive at factory within one week after machine arrived at factory.
About after-sales service 1. Q: What is the warranty time? A: 5 years after machine arrived at factory2. Q: How to solve the problem? A: Within half an hour after getting customer' problem, inform the solution way, there are three ways for different conditions. 1, Which can be solved by phone or Email, it will be solved in two hours. 2. Which can be solved by Remote Control, it will be solved within four hours(machine is equipped by Remote Network Control Problem). 3. Which need solve it on site, engineer arrive at factory within one week(in the two years warranty date, engineer has the visa any time of the country where the machine.
>>
Corn Puff Snack Extrusion Food Machinery
>>
LED Light Product Borosilicate Glass Cover Solar Indoor Night Light 60W Explosion Proof Light
>>
Taijia TEM-91 Digital Display Schmidt Concrete Test Hammer for Rebound Test concrete rebound hammer
>>
Cheap 100pcs /box New Fishing Hooks High Carbon Steel Fishing Hooks
>>
Wholesale Feed Processing Machinery Small Farm Use Chicken Feed Making Machine Fish Feed Extruder Pellet Machine China Factory Feed Hammer Mill Machine
>>
Factory Price Multi-Functional Steel Grain Agricultural Machinery Feed Silo
>>
Pure Natural Bean Exports Wholesale Factory Price High Yield Red Kidney Bean
>>
Factory Supplies Baluster Railing Shaping Machine Granite Stone Profiling Cutting Machine
>>
Custom New Energy Vehicle Electric Car 45km/H Sedan 4 Wheeler Electric Golf Cart Buggy
>>
IHF Lined Fluoroplastics/PVDF/PTFE/PFA/PP/F46 Horizontal Chemical Pump
>>
Hot Filling Juice 6 Cavity High Temperature Pet Bottle Blowing Machine Price
>>
Ship Launching Airbag Lifting Airbag Floating Airbag Salvage Rubber Airbags
>>
Wholesale cast iron polyacyl ester floor stick wear-resistant and corrosion-resistant nylon floor stick
>>
SHOOB Ire Service Commanding Car China Suppliers Right-Hand-Side Drive Fire Fighting Trucks
>>
Outdoor Wrought Iron French Patio Glass Door Lowes Wrought Iron Front Double Main Entry Storm Door Price
>>
Laser Cutting Loader with High-Capacity Material Storage Solutions
>>
Reflective Sticker
>>
Custom Nylon Polyester Draw String Knapsack Blue Drawstring Backpacks Sports Bags
>>
Google Assistant Youth Edition Xiaomi Mi Smart Portable 1080P DLP Mini Short Throw Projector
>>
Kitchen Accessories Home and Kitchen Cookware Sets Silicone Kitchen Utensils Set Baking Tools Silicone Kitchen Cooking Utensils Set