Welcome to visit

Metal Handrail Balustrades Pipe/Tube Making Machine

US$9,500.00
4-8 Pieces
US$9,000.00
9-19 Pieces
US$8,500.00
20+ Pieces

Basic Info.

Model NO.
Tube End Forming Machine
Driving Motor
4kw
Diameter Range
Diameter Range
Length Range
300-1000mm
Capacity
10-20PCS/H
Transport Package
Wooden Box
Trademark
BW
Origin
China
Production Capacity
10000 Piece/Pieces Per Month

Product Description


Product Description

Detailed Photos
Product Parameters
Parameter Data
1
Wire Material
Carbon steel wire
2
Wire Diameter
1.1-1.5mm
3
Cutting Length
100-5000mm
4
Work Speed
0~150m/min, adjustable by Inverter
5
Cutting Tolerance
+/-0.5mm/1m
6
Control System
PLC control / HMI
7
Motor Power
1.50KW

8
Electric System
380V, 50Hz, 3Phae (Customized)
9
Dimension
1700 x 750 x 1350 mm (main machine)
10
Weight
860 KG

Company Profile
With continuous progress anddevelopment in past two decades, now Bangwin machine is becoming the leading machinemanufacturer and solution supplier in HVAC and Refrigeration industry. Also we aredeeply involved into polyurethane foam insulation injection and spraying machine, metalwire and strip forming machine, car wheel rim machinery and cookware industryequipment, steel ball equipment, etc.We are good at turnkey project and real one-stop service. For turnkey project, we canhelp you for new workshop layout, investment plan, marketing research, cost and priceevolution, machine shipment, commissioning and the after-sale service. For reaone-stop service, one of our professional staff will always stand with you from technicalconsulting, order confirmation, production progress, quality control to final inspection,shipment, installation and commissioning.
FAQ

1. Q: What is the power supply of the machine?A: The standard power supply in china is 380V, 3P, 50Hz. We also can customized accordingly.2. Q: What information should the customer provide to get an accurate quotation from us?A: The customer should provide the related technical requirements, drawings, pictures, industrial voltage, planned output, etc3. Q: What is the payment term A: The payment term is 30% down payment, and 70% before shipment(T/T mode), we also accept other payment term, like L/C, DA, D/P etc4. Q: What is the delivery time?A: Normally the delivery time of the machine is 30 days after receive down payment.5. Q: What is the warrantee period of the machine?A: The warrantee period is one year since the date of B/L.
>> Water Proof Disposable Plastic Pp Cpe Medical Boot Shoe Covers Disposable Non Slip
>> Windproof Sunshade Slats Aluminum Shutter Window
>> Vacuum Sealer Machine Food Meat Fruit Vegetable Vacuum Packing Paper Packaging Material
>> High Voltage Power Line Lightning Protection Suspension Type 10kv Polymer Insulator
>> For AUDI Auto Engine Timing Chain Tensioner Car Engine 06E109217A 06E109217H TN1505-2
>> 2021 Shangtao The New Yarn Guide Textile Ceramic
>> Colorful children indoor plastic slide and swing playground toys equipment for sale
>> Interior Decoration Aluminum Expanded Metal Mesh for Ceiling Tiles
>> Diamond Saw Blade Granite Marble Cutting Disc Porcelain Tile Ceramic Blades
>> C6250 Light Duty High Precision Conventional Horizontal Lathe Machine for Metal Cutting
>> New Injection Air Filter Vertical Mould Machine
>> Expanded Snack Production Line Corn Flour Puffed Food
>> High Arc Polished Chrome Basin Faucet Function Kitchen Mixer
>> online shopping Folding houseware gullwing clothes drying rack foldable standing clothes rack
>> New Wireless Door/Window Gap Detector
>> submersible sewage pump
>> 300ml Hydrogen Gas Inhalers.
>> Automatic Shenzhou Standard Export Wooden Box Hot Sale Plastic Injection Molding Machine
>> Filter end cap for air filter aluminum material for car filter caps
>> DSQC608 ABB module supply